Contractor · HVAC

Daniel O'Boyle

69 building permits since 2010 in Boston city, MA; Salem city, MA and Somerville city, MA, across 9 counties — $1,544,327 in reported job value over 62 permits that state one.

Building permits
69
Reported job value
$1.5M
Active
2010–2026
Latest permit
Sep 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boston city, MA12
  • Salem city, MA6
  • Somerville city, MA5
  • Gloucester city, MA4
  • Haverhill city, MA4
  • Natick town, MA4
  • Quincy city, MA4
  • Everett city, MA3
  • Littleton town, MA2
  • Marlborough city, MA2

Permits by year

By issue date (application date where there is none).

07.515
14
20102016201920232026*
* 2026 is year to date.
View as table
YearPermits
20104
20121
20131
20162
20172
20182
20192
202112
20225
20237
202414
20257
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC47
  • Fire sprinklers31
  • Kitchens23
  • Electrical19
  • Plumbing8
  • Roofing7
  • Demolition5
  • Gas2
  • Windows & doors1

Permit types

As the building departments classify them.

  • Mechanical Permit13
  • Sheet Metal Permit9
  • Building Permit7
  • INTREN4
  • Building Permit Application3
  • Building Permit - Sheet Metal3
  • INTEXT3
  • Mechanical Permit - Commercial2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 30, 2026Mechanical Permit - CommercialDELICIA'S CAKE BAKERY: 1. INSTALL 6' STAINLESS STEEL HOOD 2. INSTALL UL300 FIRE SUPPRESSION SYSTEM, INCLUDES ALL PARTS AND LABOR 31,500.00 3. INSTALL UPBLAST EXMarlborough City—
Sep 9, 2026Fixed Fire Suppression—Natick Town—
Aug 24, 2026Cut and Weld/Hot Works PermitHot work to weld connection between new Stainless Steel Kitchen Exhaust Hood and Grease DuctPlymouth Town—
Jun 18, 2026Building Permit - Sheet Metal1. INSTALL 8.5' STAINLESS STEEL HOOD WITH LED LIGHTS AND UTILITY CABINET ON RIGHT SIDE 2. INSTALL 10' STAINLESS STEEL WALL PANELING WITH MOULDINGS 3. INSTALL UPNatick Town$48,500
Jun 9, 2026Building Permit / Use and Occupancy1. INSTALL 8’ STAINLESS STEEL HOOD WITH MAKE UP AIR PLENUM 2. INSTALL 12’ ROUND DUCT 3. 3M FIRE WRAP 4. INSTALL DIRECT DRIVE UPBLAST FAN WITH CURB AND HINGE KITFitchburg City—
Mar 24, 2026SHT MTL1 .install (2) 7' stainless steel hoods with make up air 2. install upblast exhaust fan with curb and hinge kit 3. install rooftop electric heated make up air uBraintree Town City$26,500
Mar 23, 2026Mechanical PermitEQUIPMENT AND INSTALLATION INSTALL (2) 7' STAINLESS STEEL HOODS WITH LED LIGHTS AND UTILITY CABINET INSTALL 19' STAINLESS STEEL WALL PANELING WITH MOULDINGS INSEverett City$18,000
Mar 10, 2026Mechanical / Sheet Metal PermitINSTALLATION: 1. INSTALL STAINLESS STEEL WRAPPER BETWEEN TOP OF PSP & CEILING (CUSTOMER PROVIDED) 2. INSTALL ROOFTOP EXHAUST FAN WITH PITCHED CURB, HINGE KIT ANAmesbury City$50,000

Permit status

Where its permits stand, as the departments report them.

  • Active35
  • Completed20
  • Closed5
  • Issued4
  • Expired2
  • Finaled2
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.