Contractor · General building

MN PLUMBING PRO LLC

70 building permits since 2019 in Minneapolis city, MN; Blaine city, MN and Coon Rapids city, MN, across 2 counties — $38,500 in reported job value over 3 permits that state one.

Building permits
70
Reported job value
$38.5K
Active
2019–2026
Latest permit
Nov 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN48
  • Blaine city, MN12
  • Coon Rapids city, MN6
  • Ramsey city, MN2
  • Spring Lake Park city, MN2

Permits by year

By issue date (application date where there is none).

07.515
13
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20199
202013
202111
20227
20236
20248
20256
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing62
  • Bathrooms41
  • Kitchens26
  • Water heaters11
  • Remodels8
  • Gas5
  • Additions5
  • HVAC4

Permit types

As the building departments classify them.

  • Plumbing52
  • BLDG - Residential12
  • Res Plumbing New-Addition-Remodel RI-Final2
  • ePermit - Gas Piping1
  • ePermit - Residential Plumbing Remodel/Addition1
  • Mechanical1
  • Res Plumbing1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 2, 2026BLDG - ResidentialPlumbing - Laundry Room RemodelBlaine City—
Sep 22, 2026PlumbingUpstairs- reusing the tub. Install new anti-scald valve, toilet, and lav. Kitchen- Install sink, faucet, dishwasher, and bring stove to code. Basement Turn 1/2 Minneapolis City—
Sep 17, 2026PlumbingFull bath installing a tub, valve, toilet, and lav. 3/4 bathroom installing a valve, toilet, and lavMinneapolis City—
Sep 1, 2026BLDG - ResidentialPlumbing Permit - Bathroom RemodelBlaine City—
Aug 4, 2026PlumbingToilet, lav, kitchen sink, dish washer, water heater, laundry tubMinneapolis City—
Jul 7, 2026PlumbingFull bathroom- install tub, toilet, and lav. Kitchen- Install sink, dishwasher, and stove Adding 3/4 bathroom- install shower, toilet, and lav mechanical- instaMinneapolis City—
May 20, 2026PlumbingTurning a 1/2 Bath to a 3/4 bath. Putting the upper bathroom water lines into the ceiling. Removing galvanized water lines and installing pex through out the hoMinneapolis City—
May 7, 2026PlumbingReplumb and rewaterpipe to code. Upper level- Bathroom install tub, valve, toilet, and lav. Main Level Installing a 3/4 bath. Install shower, valve, toilet, andMinneapolis City—

Permit status

Where its permits stand, as the departments report them.

  • Closed41
  • Finaled19
  • Issued7
  • Expired3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

MN PLUMBING PRO LLC — Building Permits & Contractor Profile | Buildstats