Contractor · Electrical

CLEAN POWER CONSTRUCTION

70 building permits since 2015 in Los Angeles city, CA; Downey city, CA and Burbank city, CA, across 2 counties — $26,854,161 in reported job value over 25 permits that state one.

Building permits
70
Reported job value
$26.9M
Active
2015–2026
Latest permit
Feb 25, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA63
  • Downey city, CA3
  • Burbank city, CA1
  • Norwalk city, CA1
  • Oceanside city, CA1
  • Santa Clarita city, CA1

Permits by year

By issue date (application date where there is none).

01530
26
2019202120232026*
* 2026 is year to date.
View as table
YearPermits
20152
20195
202026
202115
20227
20233
20252
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical42
  • Solar38
  • Roofing4
  • Battery storage1
  • EV chargers1
  • Electric meters1
  • New construction1

Permit types

As the building departments classify them.

  • Electrical42
  • Bldg-Alter/Repair24
  • Bldg-New1
  • BLD SOLAR PV RES1
  • Solar1
  • Solar Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 25, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Feb 25, 2026ElectricalEplan) pv1 for installation of roof mounted solar panels. Pv system includes 10 modules with 5 microinverters connected to existing main service panel. System sLos Angeles City—
Feb 23, 2026ElectricalMain panel upgrade to 200/225aLos Angeles City—
Feb 19, 2026ElectricalEplan) pv1 for installation of roof mounted solar panels. Pv system includes 16 modules with 8 microinverters, connected to existing 400a main service panel (gaLos Angeles City—
Feb 4, 2026ElectricalChanges to the approved set. Updated equipment locations and kaic rating. Attention to edwin lizarraga. Original description: pv1 for installation of roof mountLos Angeles City—
Feb 4, 2026ElectricalSolarapp+ - solar 1.66kw and 4 panelsDowney City—
Feb 4, 2026ElectricalSolarapp+ - solar 1.66kw and 4 panelsDowney City—
Feb 4, 2026ElectricalSolarapp+ - solar 1.66kw and 4 panelsDowney City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated32
  • Issued17
  • Finaled13
  • Active8

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • CLEAN POWER GROUP INC
  • CLEAN POWER SOLUTIONS
  • CLEAN POWER

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.