Contractor · HVAC

SumZero Energy Systems

71 building permits since 2017 in Brookline town, MA; Framingham city, MA and Attleboro city, MA, across 4 counties — $636,319 in reported job value over 33 permits that state one.

Building permits
71
Reported job value
$636.3K
Active
2017–2026
Latest permit
Oct 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Brookline town, MA34
  • Framingham city, MA19
  • Attleboro city, MA3
  • Easton town, MA2
  • Arlington town, MA2
  • Somerville city, MA2
  • Bellingham town, MA2
  • Stoughton town, MA2
  • Bridgewater Town city, MA2
  • Lexington town, MA1

Permits by year

By issue date (application date where there is none).

01530
26
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20171
20201
20211
20224
20235
20248
202526
2026 (YTD)25

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC45
  • Heat pumps36
  • Electrical23
  • Gas6
  • Plumbing2
  • Remodels1
  • Additions1
  • Water heaters1
  • Electric meters1

Permit types

As the building departments classify them.

  • Residential Mechanical - Sheet Metal18
  • Res Sheet Metal17
  • Residential Electrical12
  • ELECT.6
  • Residential Gas3
  • BUILD2
  • Com Sheet Metal2
  • ELECT2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 13, 2026Residential Electrical121 CENTRE STREET Wiring associated with replacement of existing SkyMark HVAC unit with new MagicPak unit - Remove old SkyMark unit - Build transitions to adaptBrookline Town—
Oct 6, 2026Residential Gas121 CENTRE STREET Replace existing SkyMark HVAC unit with new MagicPak unit - Install gas line - Set gas pressureBrookline Town$1,074
Sep 22, 2026Residential Mechanical - Sheet MetalMP_261 Russett Rd Installation of a brand new Mitsubishi 42,000 BTU Hyper Heat Pump Unit, Mitsubishi 5-Port Refrigerant distribution branch box, Mitsubishi 18,0Brookline Town$46,086
Aug 31, 2026—Installation of a Trane 96% AFUE single-stage Gas Furnace designed to deliver reliable heating with natural or propane gas. Built for energy savings and long-laSomerville City—
Aug 11, 2026Residential ElectricalUpgrade service to 200 amps overhead UA 27921015, meter main outside. Installation of a new line voltage electrical for (2) systems. Includes: - New disconnect Brookline Town—
Jul 10, 2026Residential Mechanical - Sheet MetalBRYANT 36K BTU Crossover Heat Pump & 21" Evaporator Coil Duct Work Modification and Removal - units must be as close to exterior wall per installation instructiBrookline Town$19,564
Jul 1, 2026ELECT.—Attleboro City—
Jun 18, 2026Residential ElectricalWiring for new heat pump / AC. - New disconnect - GFCI outletBrookline Town—

Permit status

Where its permits stand, as the departments report them.

  • Issued40
  • Not stated20
  • Closed4
  • Active3
  • Completed3
  • Finaled1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • SUMZERO ENERGY SYSTEMS LLC
  • SUM ZERO ENERGY
  • SUMZERO ENERGY
  • SUM ZERO ENERGY SYSTEMS

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.