Contractor · Specialty (solar, fire, telecom)

pv squared

71 building permits since 2022 in 2501519370, MA and Ludlow town, MA, across 2 counties.

Building permits
71
Reported job value
—
Active
2022–2026
Latest permit
Jan 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • 2501519370, MA55
  • Ludlow town, MA16

Permits by year

By issue date (application date where there is none).

02040
36
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20225
202313
202413
202536
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar52
  • Electrical42
  • Roofing6
  • EV chargers2
  • Electric meters1

Permit types

As the building departments classify them.

  • ELECT.42
  • RESI.19
  • COMM.10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 12, 2026ELECT.service: replace failed optimizer on existing pv system with same make and model.Easthampton Town City—
Jan 12, 2026RESI.de-install existing roof mounted pv system for the purpose of re-roofing. once roof is finished, we will re-install the pv.Easthampton Town City—
Jan 6, 2026COMM.installation of a small-scale ground-mount pv system consisting of (3) sub-arrays total system size = (120) 530 watt panels; 63.6 kw-dc / 50 kw-acEasthampton Town City—
Jan 6, 2026ELECT.service: replace failed optimizer on existing pv array with same make and model under warranty.Easthampton Town City—
Dec 18, 2025ELECT.installation of a small-scale ground-mount pv system consisting of (3) sub-arrays; total system size = (120) 530 watt panels; 63.6 kw-dc / 50 kw-acEasthampton Town City—
Oct 29, 2025ELECT.de-install and re-install roof mounted pv array for the purpose of re-roofing.Easthampton Town City—
Sep 17, 2025ELECT.service: replace failed optimizer on existing pv system with same make and model under warranty.Easthampton Town City—
Sep 15, 2025ELECT.service: replace failed optimizer on existing pv system with same make and model under warranty.Easthampton Town City—

Permit status

Where its permits stand, as the departments report them.

  • Issued43
  • Completed27
  • Pending payment1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.