Contractor · Electrical

Blaine Meyer

71 building permits since 2022 in Mesa city, AZ — $852,474 in reported job value over 70 permits that state one.

Building permits
71
Reported job value
$852.5K
Active
2022–2026
Latest permit
Sep 25, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ71

Permits by year

By issue date (application date where there is none).

02040
33
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20222
20237
202411
202516
2026 (YTD)33

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical71
  • Solar64
  • Battery storage58
  • Electric meters56

Permit types

As the building departments classify them.

  • Electrical71

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 25, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIMesa$10,500
Sep 18, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIMesa$10,500
Sep 16, 2026ElectricalPERMIT IS FOR THE EXISTING TESLA POWER POWERWALL3 BATTERY AND INSTALLATION OF A NEW TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPMesa$10,500
Sep 10, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$10,500
Sep 1, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICMesa$10,500
Aug 10, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIMesa$10,500
Jul 30, 2026ElectricalPERMIT TO UPGRADE TO A 225A SERVICE PANEL AND INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. AMesa$10,500
Jul 14, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$10,500

Permit status

Where its permits stand, as the departments report them.

  • C/o issued66
  • Issued3
  • Paid1
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.