Contractor · Electrical
Blaine Meyer
71 building permits since 2022 in Mesa city, AZ — $852,474 in reported job value over 70 permits that state one.
- Building permits
- 71
- Reported job value
- $852.5K
- Active
- 2022–2026
- Latest permit
- Sep 25, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ71
Permits by year
By issue date (application date where there is none).
02040
33
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 2 |
| 2023 | 7 |
| 2024 | 11 |
| 2025 | 16 |
| 2026 (YTD) | 33 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical71
- Solar64
- Battery storage58
- Electric meters56
Permit types
As the building departments classify them.
- Electrical71
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 25, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTI | Mesa | $10,500 |
| Sep 18, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTI | Mesa | $10,500 |
| Sep 16, 2026 | Electrical | PERMIT IS FOR THE EXISTING TESLA POWER POWERWALL3 BATTERY AND INSTALLATION OF A NEW TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFP | Mesa | $10,500 |
| Sep 10, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $10,500 |
| Sep 1, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVIC | Mesa | $10,500 |
| Aug 10, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTI | Mesa | $10,500 |
| Jul 30, 2026 | Electrical | PERMIT TO UPGRADE TO A 225A SERVICE PANEL AND INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. A | Mesa | $10,500 |
| Jul 14, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED | Mesa | $10,500 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued66
- Issued3
- Paid1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.