Contractor · Electrical
PEAK POWER SOLUTIONS INC
72 building permits since 2016 in Los Angeles city, CA; San Diego County, CA and Oceanside city, CA, across 5 counties — $92,600 in reported job value over 5 permits that state one.
- Building permits
- 72
- Reported job value
- $92.6K
- Active
- 2016–2026
- Latest permit
- Feb 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA42
- San Diego County, CA9
- Oceanside city, CA8
- Riverside city, CA5
- Anaheim city, CA2
- Norwalk city, CA2
- Brea city, CA1
- Redlands city, CA1
- Temecula city, CA1
- Vista city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 15 |
| 2017 | 7 |
| 2018 | 7 |
| 2019 | 17 |
| 2020 | 7 |
| 2021 | 6 |
| 2022 | 5 |
| 2023 | 2 |
| 2024 | 3 |
| 2025 | 2 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical49
- Solar34
- Roofing5
- Battery storage1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical43
- BLD SOLAR PV RES6
- Residential3
- BRES2
- Existing2
- B-BSP Solar1
- BLDG - Building (R)1
- BLD SOLAR PV RES - PV WITH UPGRADE1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 12, 2026 | Electrical | Rooftop mounted solar energy system.18 his-t440nf(bk) solar modules.18 iq8m-72-2-us {240v} microinverters.system size: 7.92 kw dc (5.85 kw ac) | Brea City | — |
| Sep 29, 2025 | Residential | UPGRADE ELECTRICAL SERVICE METER PANEL TO 200 AMP | Riverside City | $4,800 |
| Apr 16, 2025 | Residential | INSTALL PV SOLAR SYSTEM WITH (16) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 6.880 KW | Riverside City | $23,800 |
| Jul 3, 2024 | — | Photovoltaic System: Remove And Reinstall Solar: Ref:bld2014-04618 | Anaheim City | — |
| Apr 5, 2024 | Residential Electrical | (1) BATTERY STORAGE. | Norwalk City | — |
| Mar 4, 2024 | Solar Panel | NEW PV SOLAR INSTALLATION SYSTEM 7.29 KW WITH (18) Q-CELL MODULES, (18) MICRO INVERTERS, (1) ENPHASE COMBINER. | Norwalk City | — |
| Mar 29, 2023 | BLDG - Building (R) | — | Temecula City | — |
| Jan 24, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated44
- Finaled15
- Completed8
- Issued3
- Active2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.