Contractor · Electrical

PEAK POWER SOLUTIONS INC

72 building permits since 2016 in Los Angeles city, CA; San Diego County, CA and Oceanside city, CA, across 5 counties — $92,600 in reported job value over 5 permits that state one.

Building permits
72
Reported job value
$92.6K
Active
2016–2026
Latest permit
Feb 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA42
  • San Diego County, CA9
  • Oceanside city, CA8
  • Riverside city, CA5
  • Anaheim city, CA2
  • Norwalk city, CA2
  • Brea city, CA1
  • Redlands city, CA1
  • Temecula city, CA1
  • Vista city, CA1

Permits by year

By issue date (application date where there is none).

01020
17
201620182020202220242026*
* 2026 is year to date.
View as table
YearPermits
201615
20177
20187
201917
20207
20216
20225
20232
20243
20252
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical49
  • Solar34
  • Roofing5
  • Battery storage1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical43
  • BLD SOLAR PV RES6
  • Residential3
  • BRES2
  • Existing2
  • B-BSP Solar1
  • BLDG - Building (R)1
  • BLD SOLAR PV RES - PV WITH UPGRADE1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 12, 2026ElectricalRooftop mounted solar energy system.18 his-t440nf(bk) solar modules.18 iq8m-72-2-us {240v} microinverters.system size: 7.92 kw dc (5.85 kw ac)Brea City—
Sep 29, 2025ResidentialUPGRADE ELECTRICAL SERVICE METER PANEL TO 200 AMPRiverside City$4,800
Apr 16, 2025ResidentialINSTALL PV SOLAR SYSTEM WITH (16) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 6.880 KWRiverside City$23,800
Jul 3, 2024—Photovoltaic System: Remove And Reinstall Solar: Ref:bld2014-04618Anaheim City—
Apr 5, 2024Residential Electrical(1) BATTERY STORAGE.Norwalk City—
Mar 4, 2024Solar PanelNEW PV SOLAR INSTALLATION SYSTEM 7.29 KW WITH (18) Q-CELL MODULES, (18) MICRO INVERTERS, (1) ENPHASE COMBINER.Norwalk City—
Mar 29, 2023BLDG - Building (R)—Temecula City—
Jan 24, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Not stated44
  • Finaled15
  • Completed8
  • Issued3
  • Active2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.