Contractor · Electrical
Parker and Sons
72 building permits since 2005 in Mesa city, AZ; Peoria city, AZ and Phoenix city, AZ — $329,761 in reported job value over 42 permits that state one.
- Building permits
- 72
- Reported job value
- $329.8K
- Active
- 2005–2025
- Latest permit
- Nov 26, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ47
- Peoria city, AZ23
- Phoenix city, AZ2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2005 | 1 |
| 2006 | 3 |
| 2007 | 3 |
| 2011 | 1 |
| 2015 | 1 |
| 2016 | 5 |
| 2017 | 5 |
| 2018 | 1 |
| 2019 | 1 |
| 2020 | 3 |
| 2021 | 5 |
| 2022 | 10 |
| 2023 | 3 |
| 2024 | 5 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical38
- Gas26
- Plumbing26
- Generators22
- HVAC3
- Electric meters2
- Solar1
- Kitchens1
- EV chargers1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Residential22
- Electrical21
- Plumbing6
- Res (OTH) -- Electrical6
- Com (OTH) -- Plumbing4
- Mechanical3
- Res (OTH) -- Plumbing3
- Com (OTH) -- Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 26, 2025 | Plumbing | Install 22kw 327,000 BTU generator, sub panel, transfer switch, and dedicated gas line at existing SFR | Mesa | $10,000 |
| Nov 21, 2024 | Mechanical | Install (1) 22KW backup generator (355K BTUS), new 200-amp electrical sub panel (ATS) and (2) 120-gallon propane tanks. | Mesa | $10,000 |
| Nov 8, 2024 | Electrical | Install a 22kw, 492,000 BTU backup generator with a new sub panel, automatic transfer switch, and dedicated gas line at existing SFR. | Mesa | $10,000 |
| Oct 30, 2024 | Electrical | install 30kw generator, sub panel, two transfer switches, and dedicated gas line | Mesa | $10,000 |
| Aug 8, 2024 | Mechanical | Thompson 24kw Generator Install 24kw backup generator, sub panel, transfer switch, and dedicated gas line | Mesa | $10,000 |
| Jun 25, 2024 | Mechanical | Install standby backup 26kw 333000 BTU generator, sub panel, transfer switch, and dedicated 10' of 1-1/4" gas line. | Mesa | $10,000 |
| Nov 2, 2023 | Electrical | THIS PERMIT IS TO UPGRADE TO A 400A SERVICE PANEL. INSTALLATION SHALL COMPLY WITH CITY OF MESA CODES AND SERVICING ELECTRIC UTILITY REQUIREMENTS. DO NOT DISCONN | Mesa | $3,750 |
| Aug 22, 2023 | Electrical | THIS PERMIT IS FOR THE INSTALLATION OF A NEW 24kW GENERAC GENERATOR, SUB-PANEL TRANSFER SWITCH, GAS LINE and (2) 120 GAL POPANE TANKS. ALL WORK TO BE PERFORMED | Mesa | $10,000 |
Permit status
Where its permits stand, as the departments report them.
- Finaled29
- C/o issued29
- Expired6
- Issued5
- Paid1
- Completed1
- Pending payment1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.