Contractor · Roofing

ACR ELECTRICAL & PLUMBING CORP

72 building permits since 2022 in Sacramento city, CA; Sacramento County, CA and Davis city, CA, across 4 counties — $1,777,295 in reported job value over 69 permits that state one.

Building permits
72
Reported job value
$1.8M
Active
2022–2026
Latest permit
Sep 16, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento city, CA38
  • Sacramento County, CA16
  • Davis city, CA8
  • Citrus Heights city, CA6
  • Placer County, CA3
  • Marin County, CA1

Permits by year

By issue date (application date where there is none).

012.525
25
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20228
202315
202411
202512
2026 (YTD)25

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing29
  • Electrical9
  • HVAC8
  • Plumbing8
  • Solar4
  • Battery storage2

Permit types

As the building departments classify them.

  • Single Family35
  • RRZR8
  • RE-ROOF RESIDENTIAL6
  • Reroof5
  • RERC3
  • RERR3
  • Roofing3
  • MISR2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 16, 2026MISRInstalling - (15) LONGI SOLAR 410W SOLAR MODULES (5) MCI-2 SOLAR SHUTDOWNS 2 TESLA POWERWALL 3 TESLA BACKUP SWITCHSacramento County$35,000
Sep 14, 2026Single FamilyE-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 22 squares of 40yr Laminated Dimensional Composition. CRRC: 0676-0136Sacramento$20,435
Aug 28, 2026RERRRemove existing 1 Layer shingles & replace with shingles.Sacramento County$22,705
Aug 27, 2026RERC108, 131, or 132 inspection required prior to covering any work; REVO1 Tear off shingles go back with shingles. REV01 Tear off shingles go back with shinglesSacramento County$21,585
Aug 21, 2026RRZRRe-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tear off shingles Sacramento County$25,075
Aug 5, 2026Single FamilyE-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 16 squares of 40yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greatSacramento$18,350
Jul 29, 2026RERC108, 131, or 132 inspection required prior to covering any work; Church: Tear off shingles go back with shinglesSacramento County$14,355
Jul 3, 2026RRZRRe-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tear off existing Sacramento County$40,241

Permit status

Where its permits stand, as the departments report them.

  • Issued44
  • Completed12
  • Finaled11
  • Cancelled3
  • Not stated1
  • Additional information required1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • ACR ELECTRICAL AND AMP PLUMBING
  • ACR ELECTRICAL AND PLUMBING

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.