Contractor · Electrical

HAYNIE ELECTRICAL SERVICES INC

710 building permits since 2016 in Chesterfield County, VA and Henrico County, VA, across 2 counties — $11,938,020 in reported job value over 710 permits that state one.

Building permits
710
Reported job value
$11.9M
Active
2016–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Chesterfield County, VA555
  • Henrico County, VA155

Permits by year

By issue date (application date where there is none).

075150
102
201620182020202220242026*
* 2026 is year to date.
View as table
YearPermits
201618
201738
201838
201986
202071
202182
202251
202371
202464
202589
2026 (YTD)102

Type of work

Permits describing each kind of work; one permit can cover several.

  • Generators497
  • Electrical421
  • Gas320
  • Plumbing94
  • Remodels49
  • Electric meters22
  • HVAC17
  • Solar5
  • Bathrooms4
  • EV chargers4

Permit types

As the building departments classify them.

  • Residential Electrical306
  • Residential Gas206
  • Electrical Permit74
  • Alteration41
  • Commercial Electrical41
  • New Installation21
  • Mechanical Permit13
  • Repair/Replacement6

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026Residential ElectricalINSTALL (1) 22KW STANDBY GENERATOR WITH (1) 200AMP WITH ATS.Chesterfield County$7,900
Oct 30, 2026Residential GasRUN PROPER PRODUCT LINE FROM EXISITING METER TO NEWLY INSTALLED 22KW (306K BTU) STANDBY GENERATOR. NATURAL GASChesterfield County$800
Oct 27, 2026Residential GasRUN PROPER PRODUCT LINES FROM EXISITING METER TO NEWLY INSTALLED 22KW (306K BTU'S) NATURAL GAS STANDBY GENERATOR.Chesterfield County$800
Oct 26, 2026Residential ElectricalInstall one (1) 22 kW standby generator with one (1) 200-amp automatic transfer switch (ATS) and replace the existing 200-amp electrical panel with a new 200-amChesterfield County$7,900
Oct 16, 2026Residential ElectricalINSTALL (1) 18KW STANDBY GENERATOR WITH (1) 200 AMP ATS.Chesterfield County$6,900
Oct 16, 2026Residential GasRUN PROPER PRODUCT LINE FROM EXISITNG METER TO NEWLY INSTALLED 18KW (306K BTU) STANDBY GENERATOR. Natural Gas PROVIDENCE VILLAS DUPLEX UNIT 20BChesterfield County$800
Oct 12, 2026Residential Electrical-Install 200amp Westinghouse automatic transfer switch to the right of the meter base -Rework the main feeder cables from the meter to the ATS and to the main pChesterfield County$1,200
Oct 7, 2026Residential ElectricalINSTALL (1) 22KW STANDBY GENERATOR WITH (1) 200AMP ATS.Chesterfield County$7,900

Permit status

Where its permits stand, as the departments report them.

  • Issued616
  • Completed68
  • Finaled24
  • Active1
  • Cancelled1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.