Contractor · Electrical

SOUTHWEST INDUSTRIAL ELECTRIC

74 building permits since 2013 in Los Angeles city, CA; San Diego County, CA and Anaheim city, CA, across 6 counties — $48,800 in reported job value over 3 permits that state one.

Building permits
74
Reported job value
$48.8K
Active
2013–2026
Latest permit
Jan 14, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA65
  • San Diego County, CA3
  • Anaheim city, CA1
  • Sacramento County, CA1
  • Camarillo city, CA1
  • Oceanside city, CA1
  • Redlands city, CA1
  • Sacramento city, CA1

Permits by year

By issue date (application date where there is none).

0510
10
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20133
20146
20158
20168
20179
20186
20198
202010
20213
20229
20231
20241
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical73
  • EV chargers4
  • Remodels3
  • Electric meters3
  • Gas1
  • Generators1

Permit types

As the building departments classify them.

  • Electrical65
  • Existing2
  • B-BEP Electrical Permit1
  • BLD COMMERCIAL PME - COMPLEX1
  • CBNC1
  • EV Charging Station1
  • MISC. COMMERCIAL - ALTERATION1
  • Unknown1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 14, 2026CBNCUPGRADE EXISTING SMUD UTILITY SERVICE TO SERVICE THE INSTALLATION OF (14) 80A L2 CHARGERS AND (1) 50kW DC FAST CHARGER ALONG WITH SUPPORTING INFRASTRUCTURE; (1)Sacramento County$15,000
Oct 3, 2025BLD COMMERCIAL PME - COMPLEXNEW ELECTRICAL SERVICE AND DISTRIBUTION WITH FEEDERSOceanside City—
Oct 17, 2024—Tenant Improvement: Construct (6) Structures To Support (62) Level 2 Single Port Ev Chargers Inside Building. (2) Level 3 Dual Port Ev Chargers To Be Installed Anaheim City—
Aug 10, 2023MISC. COMMERCIAL - ALTERATION—Camarillo City$18,800
Jul 25, 2022Electrical[ePlan] Power plan check only for new generator and power for equipmenLos Angeles City—
Jul 13, 2022EV Charging StationEPC - Install two (2) wall mount chargers similar to CS-100s. Includes: New circuit breakers in the existing service. Conduit and wire to the charger locations.Sacramento$15,000
May 5, 2022Electrical$0 permit fees due to AB 1414. [EPLAN] PV2, Scope of work includes 1Los Angeles City—
Apr 13, 2022Electrical—Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated66
  • Finaled3
  • Completed3
  • Issued2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.