Contractor · Electrical

PROBUILT STRUCTURES

74 building permits since 2018 in Citrus County, FL; St. Lucie County, FL and Crystal River city, FL, across 6 counties — $36,922 in reported job value over 5 permits that state one.

Building permits
74
Reported job value
$36.9K
Active
2018–2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Citrus County, FL66
  • St. Lucie County, FL2
  • Crystal River city, FL2
  • Duval County, FL1
  • Okeechobee County, FL1
  • North Port city, FL1
  • Ocala city, FL1

Permits by year

By issue date (application date where there is none).

02040
36
20182022202420252026*
* 2026 is year to date.
View as table
YearPermits
20181
20221
20241
202535
2026 (YTD)36

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical65
  • Plumbing5
  • Windows & doors2
  • New construction2

Permit types

As the building departments classify them.

  • Accessory Structure64
  • Building2
  • Aluminum Structure1
  • Building Permit1
  • Building Residential - Shed1
  • Concrete1
  • Environmental - Vegetation Removal1
  • Residential Accessory Structure1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2026Accessory Structure10x20 DCA Shed on Dirt. No Electric. ** SITE PLAN APPROVED FOR 10x20 SHED ONLY, NO TREES TO BE REMOVED AT THIS TIME. ** NOC FOR 10x20 SHED IN OR BK 3719 PG 2432Citrus County—
Oct 26, 2026Accessory Structure30x25 Metal Building on new concrete w/ 256 sqft addtl concrete. No electric / NOC ON FILE FOR 30X25 METAL STORAGE BUILDING ON NEW CONCRETE W/ 256 SQFT OF ADDTLCitrus County—
Oct 21, 2026Accessory Structure28x35 metal building on concrete, 12'X20' APRON, 3'X35' SIDE WALKWAY, 3'X37' SIDEWALK, and 14x120 rock access path. No electric.Citrus County—
Oct 21, 2026Accessory Structure14x30 Open Carport anchored to dirt with base rails installed below grade. No electric ** UNITY OF TITLE FOR LOTS 24 & 25 IN OR BK 3697 PG 1720 *8 ** FLOOD ZONECitrus County—
Oct 19, 2026Accessory Structure10x20 DCA greenhouse shed on dirt. No electric *NOC FOR 10X20 DCA GREENHOUSE SHED ON DIRT. NO ELECTRIC IN OR BK 3712 PG 1948* *SITE REVIEW APPROVED FOR 10' X 20Citrus County—
Oct 15, 2026Accessory Structureuploading engineering for flood vents. (BLD2610-0647: **ATF** 10x12 PRE FAB Shed on Dirt. No electric. No Plumbing)Citrus County—
Oct 13, 2026Accessory Structure10x24 DCA Shed on dirt. No electric /NOC ON FILE FOR 10X24 DCA SHED ON DIRT, NO ELECTRIC IN OR BK:3712 PG:1944 / **SITE APPROVED FOR NEW 10' X 24' SHED ON GROUNCitrus County—
Oct 13, 2026Accessory Structure12x24 DCA Shed on Dirt. No electric. **SITE APPROVED FOR 12X24 SHED ON GROUND ONLY.** **NOC OR BK:3715 PG:916 FOR 12X24 SHED ON DIRT NO ELECTRIC. RECORDED NOC TCitrus County—

Permit status

Where its permits stand, as the departments report them.

  • Closed52
  • Issued10
  • Finaled4
  • Cancelled2
  • Additional information required2
  • Expired1
  • Approved1
  • Abandoned1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.