Contractor · HVAC

Aaron Benson

74 building permits since 2019 in Bristol town, CT; Winchester town, CT and Glastonbury town, CT, across 3 counties — $1,170,600 in reported job value over 74 permits that state one.

Building permits
74
Reported job value
$1.2M
Active
2019–2026
Latest permit
Jul 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Bristol town, CT57
  • Winchester town, CT7
  • Glastonbury town, CT5
  • South Windsor town, CT4
  • Enfield town, CT1

Permits by year

By issue date (application date where there is none).

01020
19
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20191
20203
20213
202219
202313
202418
20259
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC74
  • Gas42
  • Kitchens15
  • Bathrooms9
  • Plumbing9
  • Heat pumps9
  • Electrical6
  • Remodels3
  • Demolition3
  • Water heaters3

Permit types

As the building departments classify them.

  • HVAC/Mechanical Permit57
  • Mechanical Permit10
  • Mechanical Permit (HVAC & Associated work)4
  • Building Permit (No Trades)3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 21, 2026Mechanical Permit (HVAC & Associated work)Install new HEIL 60k 96% two stage LP furance with 2 ton 15 seer split r454b ac system. New single zone duct system. New LP line from new outdoor tanks to furnaWinchester Town$18,000
Jul 21, 2026Mechanical Permit (HVAC & Associated work)Install new HEIL 60k btu/h 96% two stage LP furnace with 2 ton 18 SEER two stage R454b split ac system. New single zone duct system using the basement cieling fWinchester Town$14,000
Jul 1, 2026HVAC/Mechanical PermitInstall new HEIL 80k 96% two stage furnace with 3 ton R454b 14 SEER split ac system. New three zone duct system (First floor kitchen/living area, first floor beBristol Town$22,500
Jul 1, 2026HVAC/Mechanical PermitInstall new 24k Mitsubishi two head ductless heat pump. One 12k head in the living room/kitchen area and one in the master bedroom. Electrical to be completed bBristol Town$11,500
Jun 23, 2026Mechanical PermitAdd new fourth zone for new finished basement off existing American Standard 120k 95% furnace and 5 ton AC coil / condenserGlastonbury Town$5,500
May 6, 2026Mechanical Permit (HVAC & Associated work)Install new three zone duct system for new geothermal heating and cooling system. All venting including ERV system for fresh air. **PLEASE NOTE** this a sheetmeWinchester Town$28,500
Mar 23, 2026HVAC/Mechanical PermitInstall new HEIL 100k 96% two stage lp furnace with 4 ton 15 seer R454b split ac system. New three zone duct system. All venting for dryer, bath fans, kitchen hBristol Town$23,500
Jan 13, 2026Mechanical Permit (HVAC & Associated work)Install new HEIL 96% two stage LP furnace with 3 ton 15 seer R454b split ac system. New three zone duct system. All mechanicals for HVAC system. New gas lines fWinchester Town$20,000

Permit status

Where its permits stand, as the departments report them.

  • Completed62
  • Active12

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.