Contractor · Electrical
V3 ELECTRIC INC
724 building permits since 2015 in Sacramento County, CA; Los Angeles city, CA and Davis city, CA, across 29 counties — $9,482,312 in reported job value over 384 permits that state one.
- Building permits
- 724
- Reported job value
- $9.5M
- Active
- 2015–2026
- Latest permit
- Oct 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA95
- Los Angeles city, CA70
- Davis city, CA67
- Tuolumne County, CA65
- Amador County, CA43
- Sacramento city, CA29
- Chico city, CA28
- Temecula city, CA26
- Norwalk city, CA25
- Madera city, CA24
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 8 |
| 2016 | 29 |
| 2017 | 12 |
| 2018 | 21 |
| 2019 | 48 |
| 2020 | 34 |
| 2021 | 61 |
| 2022 | 89 |
| 2023 | 142 |
| 2024 | 81 |
| 2025 | 56 |
| 2026 (YTD) | 113 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar478
- Electrical312
- Battery storage191
- Roofing64
- Plumbing19
- Water heaters15
- Electric meters12
- HVAC11
- Additions3
- EV chargers3
Permit types
As the building departments classify them.
- Electrical157
- PHOTOVALTIC RESIDENTIAL48
- MISR44
- ROOF MOUNT SOLAR33
- B-BSP Solar24
- Single Family23
- BLDG - Building (R)22
- APPR21
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 19, 2026 | RESIDENTIAL | — | Marin County | $3,500 |
| Jul 24, 2026 | Electrical Permit | ROOFMOUNT PV SOLAR 4.74KW, 12 MODULES, 12 INVERTERS, (1) ESS & (1) 225 AMP SUB PANEL | Rosemead City | — |
| Jul 1, 2026 | — | Photovoltaic System: Install Residential Roof Mounted Solar (9) Modules And (1) Ess | Anaheim City | — |
| Jun 3, 2026 | MISC | ROOF MOUNTED SOLAR, MODULE QTY 78, DC 30.81 kW, 3 X TESLA BATTERIES, MPU TO 200/225. REV01 Updated Revision Table on P1. Updated Delta Sybold on SLD P4b. | Sacramento County | $122,430 |
| Jun 1, 2026 | PVR | Roof Solar - 14 Module 5.74kW, ESS- 1x Tesla PW3 13.5kWh, Tesla Backup Switch 1624171-xx-y | Contra Costa County | $37,559 |
| May 22, 2026 | SFD SOLAR PV - ENERGY STORAGE SYSTEM | Roof mount solar, Module Qty 12, 4.92 kW DC, Battery Qty 2 | Oceanside City | — |
| May 22, 2026 | SolarAPP+ Solar Permit | Roof mount solar, Module Qty 10, 4.1 kW DC, Battery Qty 1 x Enphase (TOU), MPU to 225a | Cypress City | $25,871 |
| May 21, 2026 | Building Permit Application | 12ft Trench Thru Dirt, 1x Enphase IQ5P 5kWh, Derating MSP to 150/200A, New 125/125A Solar Load Center, Roof Solar to be installed on HCD MFD Home and permitted | Clearlake City | $18,007 |
Permit status
Where its permits stand, as the departments report them.
- Not stated214
- Issued162
- Completed142
- Finaled125
- Active36
- Closed17
- Expired7
- Withdrawn5
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.