Contractor · Electrical
SUNRUN SOLAR
76 building permits since 2015 in Seaside city, CA; Santa Clarita city, CA and Manteca city, CA, across 4 counties — $600,426 in reported job value over 57 permits that state one.
- Building permits
- 76
- Reported job value
- $600.4K
- Active
- 2015–2026
- Latest permit
- Mar 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Seaside city, CA57
- Santa Clarita city, CA7
- Manteca city, CA5
- Lancaster city, CA3
- San Bruno city, CA3
- Stockton city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 3 |
| 2016 | 2 |
| 2017 | 6 |
| 2018 | 6 |
| 2019 | 6 |
| 2020 | 7 |
| 2021 | 16 |
| 2022 | 14 |
| 2026 (YTD) | 16 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical61
- Solar20
- Roofing12
- Battery storage7
Permit types
As the building departments classify them.
- Electrical Permit45
- Electrical16
- Roof Permit12
- RES_ALTERATION3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 20, 2026 | Electrical | Symbium-project_311d152f-f4d8-4635-bc58-75099b592431:install 27 pv modules (12.15kw) with tesla inc. Inverter; install 2 ess units, location = exterior side of | Lancaster City | — |
| Mar 20, 2026 | Electrical | Symbium-project_1f086bf5-7767-40b4-8fd0-914ac5763902:install 10 pv modules (4.5kw) with tesla inc. Inverter; install 1 ess unit, location = exterior side of ext | Lancaster City | — |
| Mar 18, 2026 | Electrical | Symbium-project_9910132a-5148-4ea5-b4ef-a2724d0714a7:install 12 pv modules (5.28kw) with tesla inc. Inverter; install 1 ess unit on an exterior wall | Manteca City | — |
| Mar 16, 2026 | Electrical | Symbium-project_3396d05a-fb7c-40d3-a84d-ce7923f24778:install 15 pv modules (6.6kw) with tesla inc. Inverter; install 2 ess units on an exterior wall | Manteca City | — |
| Mar 16, 2026 | Electrical | E-permit: solar app application id - sa20260316-150-157-7-a, residential - 8.8kw photovoltaic system main breaker replacement: - no, battery backup units: - 2, | Stockton City | — |
| Mar 10, 2026 | Electrical | Add (n) ess system to (e) photovoltaic system with subpanel per plan at sfd | Santa Clarita City | — |
| Mar 4, 2026 | Electrical | Symbium-project_cfe6a77f-8bbe-45cc-83c8-774889d8994f:add 19 pv modules (8.36kw) with tesla inc. Inverters; install 2 ess units on an exterior wall | Manteca City | — |
| Feb 23, 2026 | Electrical | Symbium-project_749e6c56-cf76-478c-8e07-9337285e451c:add 7 pv modules (2.87kw) with tesla inc. Inverter; install 2 ess units, location = exterior side of exteri | Lancaster City | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated57
- Finaled12
- Active5
- Closed2
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.