Contractor · Electrical

Electric World Corp

76 building permits since 2014 in Duval County, FL; Charlotte County, FL and Hardee County, FL, across 7 counties — $204,237 in reported job value over 75 permits that state one.

Building permits
76
Reported job value
$204.2K
Active
2014–2026
Latest permit
Sep 10, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Duval County, FL66
  • Charlotte County, FL2
  • Hardee County, FL2
  • Hernando County, FL2
  • Temple Terrace city, FL2
  • Citrus County, FL1
  • Sarasota city, FL1

Permits by year

By issue date (application date where there is none).

02550
41
20142020202220242026*
* 2026 is year to date.
View as table
YearPermits
20141
20197
202041
20218
20225
20235
20241
20253
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical66
  • HVAC8
  • New construction2
  • Remodels1
  • Generators1
  • Windows & doors1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical Permit58
  • Mechanical Permit8
  • Commercial Electrical2
  • Commercial - Accessory Permits1
  • Commercial Alteration1
  • Electrical1
  • ELECTRIC-COMM1
  • ELECTRIC-RES1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 10, 2026Commercial - Accessory PermitsInstall new single phase overhead electrical service for campground IGNORE CURRENT REVIEW, TYLER AUTO CREATED SECOND REVIEW WITHOUT SUBMITTALHernando County$25,000
Sep 10, 2026Residential - ElectricReplace outdoor circuit Breaker Panel boxHernando County$1,200
Apr 24, 2026ELECTRIC-RES—Temple Terrace City$1,100
Apr 21, 2026Commercial AlterationInstall New Interior Doors in Breakroom and Vision Center and Install Exit Sign and Emergency LightHardee County$57,123
Mar 18, 2026ELECTRIC-COMM—Temple Terrace City$1,800
Oct 7, 2025ElectricalRepair the two existing Generator Automatic Transfer switches ATS Three Phase 208 Volts, 400 and 200 amps. *NOC FOR ELECTRICAL REPAIR OF TRANSFER SWITCHES IN ORCitrus County—
May 13, 2025Residential ElectricalNew Ecoflow Smart Home Panel 2 will be install on the right side of the existing main Breaker panel 200 amps and reloacte existing 60 amps subpanel.Charlotte County$2,400
Mar 27, 2025Commercial ElectricalRelocate existing 200amp service panel and weatherproof receptacle from wood post near well to new building. Install new conduit and conductors from utility serHardee County$2,500

Permit status

Where its permits stand, as the departments report them.

  • Finaled64
  • Closed6
  • Void1
  • Issued1
  • Expired1
  • Cancelled1
  • C/o issued1
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.