Contractor · Electrical

auguste noel

76 building permits since 2009 in Milton town, MA; Boston city, MA and Dedham town, MA, across 8 counties — $315,778 in reported job value over 72 permits that state one.

Building permits
76
Reported job value
$315.8K
Active
2009–2026
Latest permit
Oct 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Milton town, MA22
  • Boston city, MA21
  • Dedham town, MA8
  • Lexington town, MA4
  • Somerville city, MA3
  • North Andover town, MA2
  • Waltham city, MA2
  • Falmouth town, MA1
  • Norton town, MA1
  • Lynnfield town, MA1

Permits by year

By issue date (application date where there is none).

048
8
201020142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20091
20102
20116
20134
20142
20152
20164
20174
20185
20195
20206
20215
20226
20234
20245
20257
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical71
  • Bathrooms16
  • Remodels7
  • Kitchens6
  • HVAC5
  • Windows & doors3
  • Electric meters3
  • Plumbing2
  • EV chargers2
  • Roofing1

Permit types

As the building departments classify them.

  • ELECT.27
  • ELECTRICAL18
  • Electrical Permit15
  • Electrical4
  • FA3
  • *Electrical Permit2
  • Electrical Permit Application1
  • Residential Alterations1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 27, 2026*Electrical PermitInstant water heater, remove 20 outlets for wall demolish, and relocate 4 switchesNorth Andover Town$8,900
Jul 7, 2026Electrical PermitService ChangeGrafton Town—
Jun 23, 2026ELECT.one outdoor deck outletRockland Town$450
Jun 17, 2026Electrical PermitRemove the meter circuit for slidingLakeville Town$650
Jun 8, 2026*Electrical PermitDisconnect sub panel, relocate emergency sign, disconnect exposed wire, and relocate 3-way switchNorth Andover Town$5,600
Apr 1, 2026Electrical Permit—Norton Town$3,000
Mar 11, 2026ELECT.increase amp from 100 amp to 200 amp. install standby generator 20kw. install tesla car charger.Falmouth Town—
Jan 23, 2026ELECT.Wire basement, one bedroom, bathroom, one room, storage room, and family room. Installing two smoke detectors. Two 30 amp disconnects.Stoughton Town$4,500

Permit status

Where its permits stand, as the departments report them.

  • Closed17
  • Finaled16
  • Completed15
  • Active14
  • Issued9
  • Not stated2
  • Cancelled1
  • Pending payment1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.