Contractor · Electrical

SUN CAPITAL ENERGY

78 building permits since 2017 in Los Angeles city, CA; Riverside County, CA and Norwalk city, CA, across 7 counties — $132,880 in reported job value over 6 permits that state one.

Building permits
78
Reported job value
$132.9K
Active
2017–2026
Latest permit
Sep 15, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA59
  • Riverside County, CA3
  • Norwalk city, CA3
  • Riverside city, CA2
  • San Diego city, CA2
  • Anaheim city, CA1
  • Lancaster city, CA1
  • Murrieta city, CA1
  • Oceanside city, CA1
  • Salinas city, CA1

Permits by year

By issue date (application date where there is none).

012.525
24
2018202120232026*
* 2026 is year to date.
View as table
YearPermits
20176
201824
201913
20212
20227
202310
20242
2026 (YTD)14

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical72
  • Solar16
  • Battery storage7
  • Additions3
  • Roofing1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical67
  • Residential Electrical2
  • Bldg-Addition1
  • BLDG - Building (R) - Solar Photovoltaic SolarAPP+1
  • BRES1
  • Real Time Photovoltaic Installation (Residential Only)1
  • Residential1
  • SFD SOLAR APP PLUS WEB1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 15, 2026SFD SOLAR APP PLUS WEBSolar Size 3.6 kW DC with 8 panels and 13.5kwh batteryOceanside City—
May 1, 2026SolarApp+ PV & ES SystemsWUI-SOLARAPP+ 7.2kW ROOF MOUNTED GRID-TIED PV w/ 13.5kWh ESSSanta Cruz City$15,000
Mar 25, 2026ElectricalInstall (n) roof-mounted photovoltaic system and (n) storage battery system with subpanel per plan at sfdSanta Clarita City—
Mar 14, 2026BLDG - Building (R) - Solar Photovoltaic SolarAPP+Rooftop Mounted Solar Energy System PV+ST 16 Q.TRON BLK M-G2+ 430 solar modules 1 1707000-XX-Y {240V, 11.5kW} inverter 1 1707000-XX-Y {11.5kW} ESS System Size: Murrieta City$34,880
Mar 12, 2026ElectricalRooftop mounted solar energy system pv+st ,17 elnsm60m-hc-450 solar modules, 1 1707000-xx-y {11.5kw} inverter 1 1707000-xx-y {11.5kw} ess main panel upgrade: yeRiverside County—
Feb 24, 2026ElectricalBxx2600260) installation of a 15 module solar pv system with 1 inverter. System size is 6.600 kwp (n) tesla backup gateway3 + (n) 125a backup loads + (n) ac disRiverside County—
Feb 20, 2026Electrical—San Diego City—
Feb 17, 2026Electrical—San Diego City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated58
  • Finaled9
  • Active5
  • Completed3
  • Issued1
  • C/o issued1
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.