Contractor · Electrical

RIOS & BURKE ELECTRIC INC

78 building permits since 2024 in Sacramento city, CA; Citrus Heights city, CA and Sacramento County, CA, across 2 counties — $340,832 in reported job value over 77 permits that state one.

Building permits
78
Reported job value
$340.8K
Active
2024–2026
Latest permit
Sep 14, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento city, CA55
  • Citrus Heights city, CA17
  • Sacramento County, CA3
  • Elk Grove city, CA2
  • Concord city, CA1

Permits by year

By issue date (application date where there is none).

02040
33
202420252026*
* 2026 is year to date.
View as table
YearPermits
202416
202529
2026 (YTD)33

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical69
  • EV chargers34
  • Plumbing3
  • HVAC2
  • Solar1
  • Bathrooms1
  • Water heaters1

Permit types

As the building departments classify them.

  • Single Family44
  • Electrical17
  • Apts 5+8
  • Duplex2
  • ONLINE VEHICLE CHARGING PERMIT2
  • PANR2
  • MISC1
  • Office1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 14, 2026ElectricalElectricalCitrus Heights City$5,000
Aug 28, 2026Single FamilyEV Charger Permit: EVSE garage 40A backside panel in garage. No raceway. 3x4 EMT to junction box. Water conserving fixtures are required to be installed throughSacramento$750
Aug 25, 2026ONLINE VEHICLE CHARGING PERMITEVSE 40A in garageElk Grove City$2,000
Aug 24, 2026Single FamilyE-Permit: existing panel 125 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, adding 1 outlets (240V).Sacramento$6,000
Aug 21, 2026Single FamilyEVSE backside panel in garage 40A maxSacramento$1,250
Aug 21, 2026Single Family40a ev circuit for level two plug in EV charger. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences bSacramento$1,950
Aug 18, 2026Single Family0kw Solar PV System, 13.5 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-outSacramento$20,000
Aug 3, 2026OfficeElectrical Permit: Replace existing 400 amp single phase main breakerSacramento$5,000

Permit status

Where its permits stand, as the departments report them.

  • Issued55
  • Finaled14
  • Closed3
  • Active2
  • Cancelled2
  • Completed2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.