Contractor · Electrical
RIOS & BURKE ELECTRIC INC
78 building permits since 2024 in Sacramento city, CA; Citrus Heights city, CA and Sacramento County, CA, across 2 counties — $340,832 in reported job value over 77 permits that state one.
- Building permits
- 78
- Reported job value
- $340.8K
- Active
- 2024–2026
- Latest permit
- Sep 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA55
- Citrus Heights city, CA17
- Sacramento County, CA3
- Elk Grove city, CA2
- Concord city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 16 |
| 2025 | 29 |
| 2026 (YTD) | 33 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical69
- EV chargers34
- Plumbing3
- HVAC2
- Solar1
- Bathrooms1
- Water heaters1
Permit types
As the building departments classify them.
- Single Family44
- Electrical17
- Apts 5+8
- Duplex2
- ONLINE VEHICLE CHARGING PERMIT2
- PANR2
- MISC1
- Office1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 14, 2026 | Electrical | Electrical | Citrus Heights City | $5,000 |
| Aug 28, 2026 | Single Family | EV Charger Permit: EVSE garage 40A backside panel in garage. No raceway. 3x4 EMT to junction box. Water conserving fixtures are required to be installed through | Sacramento | $750 |
| Aug 25, 2026 | ONLINE VEHICLE CHARGING PERMIT | EVSE 40A in garage | Elk Grove City | $2,000 |
| Aug 24, 2026 | Single Family | E-Permit: existing panel 125 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, adding 1 outlets (240V). | Sacramento | $6,000 |
| Aug 21, 2026 | Single Family | EVSE backside panel in garage 40A max | Sacramento | $1,250 |
| Aug 21, 2026 | Single Family | 40a ev circuit for level two plug in EV charger. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences b | Sacramento | $1,950 |
| Aug 18, 2026 | Single Family | 0kw Solar PV System, 13.5 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out | Sacramento | $20,000 |
| Aug 3, 2026 | Office | Electrical Permit: Replace existing 400 amp single phase main breaker | Sacramento | $5,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued55
- Finaled14
- Closed3
- Active2
- Cancelled2
- Completed2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.