Contractor · Specialty (solar, fire, telecom)
UNDERLINE CONCEPTS INC
79 building permits since 2016 in San Diego County, CA; Vista city, CA and Los Angeles city, CA, across 3 counties.
- Building permits
- 79
- Reported job value
- —
- Active
- 2016–2026
- Latest permit
- Sep 9, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- San Diego County, CA56
- Vista city, CA9
- Los Angeles city, CA7
- Temecula city, CA4
- Burbank city, CA2
- Riverside County, CA1
Permits by year
By issue date (application date where there is none).
01020
18
20172019202120232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 2 |
| 2017 | 4 |
| 2018 | 14 |
| 2019 | 17 |
| 2020 | 18 |
| 2021 | 10 |
| 2022 | 3 |
| 2023 | 4 |
| 2025 | 5 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar70
- Electrical28
- Battery storage5
- Roofing3
- Electric meters3
- EV chargers1
Permit types
As the building departments classify them.
- Electrical10
- Building Misc - Photovoltaic System (PV)8
- Existing6
- BLDG - Building (R)4
- Building Miscellaneous - Reroof1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 9, 2026 | BLDG - Building (R) | Online. Roof mount solar. 21 modules, 9.24 kw with (2) Tesla Powerwall. Garcia residence | Temecula City | — |
| Feb 4, 2026 | Electrical | Cbc 2022) main panel upgrade from 100 amp to 200/225 amp with whole home surge protector to main dwelling | Riverside County | — |
| Nov 21, 2025 | BLDG - Building (R) | ONLINE INSTALL NEW 22.620KW GROUND MOUNT PV DC SYSTEM (39) MODULES (1) INVERTER (1) LOAD CENTER (1) AC DISCINNECT/MCMILLAN RESIDENCE | Temecula City | — |
| Oct 29, 2025 | BLDG - Building (R) | Online. Solar App +. 24 solar modules 1 inverter 2 batteries New Subpanel 11.04 kW DC. Sheridan residence | Temecula City | — |
| Sep 23, 2025 | BLDG - Building (R) | ONLINE SOLARAPP+ / 3.280KW ROOF MOUNTED PV / 8 MODULES / 1 INVERTER / 1 AC DISCONNECT - RODRIGUEZ RESIDENCE | Temecula City | — |
| May 23, 2025 | Electrical | INSTALL NEW 4.100KW ROOF MOUNTED PV DC SYSTEM (10) MODULES (1) INVERTER (1) DC DISCONNECT (2) AC DISCONNECTS (1) PRODUCTION METER. PERMIT FOR (1) 200 AMP SUBPAN | Burbank City | — |
| Apr 24, 2025 | Electrical | INSTALL NEW SUB PANEL AND NEMA 14-50 EV CHARGER PLUG | Burbank City | — |
| Sep 13, 2023 | Building Misc - Photovoltaic System (PV) | ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / BATTERY | Vista City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed35
- Issued15
- Not stated10
- Finaled9
- Active6
- Expired4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.