Contractor · Specialty (solar, fire, telecom)

Skyline Solar LLC.

747 building permits since 1997 in Dartmouth town, MA; Plymouth town, MA and Ludlow town, MA, across 23 counties — $11,346,320 in reported job value over 428 permits that state one.

Building permits
747
Reported job value
$11.3M
Active
1997–2026
Latest permit
Nov 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Dartmouth town, MA109
  • Plymouth town, MA58
  • Ludlow town, MA44
  • Westford town, MA43
  • Framingham city, MA37
  • Colchester town, CT31
  • Stratford town, CT30
  • Stamford town, CT26
  • Bristol town, CT18
  • Putnam town, CT18

Permits by year

By issue date (application date where there is none).

0100200
198
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
19971
20002
20145
201528
201627
201728
201815
201941
2020132
202137
202237
202361
202448
2025198
2026 (YTD)87

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar471
  • Roofing310
  • Electrical292
  • Remodels25
  • Electric meters23
  • Battery storage7
  • New construction5
  • Windows & doors2
  • Pools & hot tubs2
  • Gas1

Permit types

As the building departments classify them.

  • Electrical Permit132
  • Residential Building Permit112
  • Electrical80
  • Building53
  • Building Permit39
  • Res Solar37
  • ELECT.34
  • Solar Permit29

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 2, 2026Stonington Solar PermitInstallation of a safe and code-compliant grid-tied solar system on an existing residential roof. 32 Panels, 13.76 kW DCStonington Town$49,000
Oct 29, 2026Electrical PermitSolar InstallSeymour Town$26,000
Oct 27, 2026Electrical Permit—Westerly Town—
Oct 27, 2026Solar Permit—Smithfield Town$29,000
Oct 27, 2026Solar Permit—Warwick City$5,000
Oct 26, 2026Electrical PermitRequired to relocate the meter due to the gas meter being within 3ft and separate neutrals and grounds in the MSP after we install a 100 amp meter main.Smithfield Town$1,800
Oct 24, 2026Electrical PermitRequired to add a main breaker in the MSP to perform a LDST in the meter main.Warwick City$650
Oct 20, 2026Electrical Permit—Westford Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed296
  • Active138
  • Closed105
  • Not stated92
  • Approved41
  • Issued36
  • Stop work ordered11
  • Finaled7

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • SKYLINE SOLAR
  • SKY LINE SOLAR

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.