Contractor · Demolition & excavation

KATE STROM

79 building permits since 2017 in Tacoma city, WA — $88,215,908 in reported job value over 54 permits that state one.

Building permits
79
Reported job value
$88.2M
Active
2017–2026
Latest permit
Aug 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Tacoma city, WA79

Permits by year

By issue date (application date where there is none).

07.515
15
20172019202220242026*
* 2026 is year to date.
View as table
YearPermits
20173
20184
20192
20218
20228
202314
202414
202515
2026 (YTD)11

Type of work

Permits describing each kind of work; one permit can cover several.

  • Grading & excavation15
  • Demolition13
  • Electrical7
  • New construction4
  • Remodels3
  • Plumbing3
  • Generators3
  • Fire sprinklers3
  • Gas2
  • HVAC2

Permit types

As the building departments classify them.

  • Site55
  • Building18
  • Utility Connection5
  • Historic1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 20, 2026SiteExpansion of the existing dining facility, the installation of a small concrete patio, and the installation of a new grease interceptor at Eliseo - Olympic AptsTacoma City$8,000,000
Jul 8, 2026SiteThe project includes the construction of EV charging stations throughout the site. Installation of additional electrical conduit, transformer, panels, and EV chTacoma City$400,000
May 19, 2026Utility ConnectionNew STORMWATER CONNECTION CPEP Method, Yes work on the ROW. Patch INspection needed. TCP approved under related SDEV23-0213Tacoma City—
Apr 24, 2026SiteScope of the project includes stormwater conveyance improvements to connect to the existing onsite storm system that connects to the city stormwater system in TTacoma City$5,000,000
Mar 27, 2026BuildingThe project consists of the design of a mechanical equipment yard at the University of Washington – Tacoma campus. The structural components of the mechanical yTacoma City$75,000
Mar 27, 2026Site*COMBINED REVIEW (w/ SDEV26-0007)* - Installation of a permanent electrical switchgear for the University of Washington Tacoma campus. Project includes the excaTacoma City—
Mar 27, 2026Site*COMBINED REVIEW* - Installation of a permanent electrical switchgear for the University of Washington Tacoma campus. Project includes the excavation to allow fTacoma City$300,000
Mar 13, 2026HistoricPer comments on SDEV26-0007/WO26-0002, a historic landmark review is required for the UWT new switch gear project.Tacoma City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled31
  • Issued25
  • Closed9
  • Expired3
  • Cancelled3
  • Pending2
  • Reviews in progress2
  • Additional information required2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.