Contractor · Specialty (solar, fire, telecom)

Freedom Forever Colorado LLC

750 building permits since 2019 in Thornton city, CO; Adams County, CO and Broomfield County, CO, across 3 counties — $14,963,382 in reported job value over 626 permits that state one.

Building permits
750
Reported job value
$15M
Active
2019–2026
Latest permit
May 18, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Thornton city, CO323
  • Adams County, CO142
  • Broomfield County, CO72
  • Commerce City city, CO55
  • Northglenn city, CO45
  • Brighton city, CO42
  • Boulder city, CO37
  • Boulder County, CO32
  • Bennett town, CO2

Permits by year

By issue date (application date where there is none).

0100200
188
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
201933
202043
202143
2022151
2023165
2024188
202597
2026 (YTD)30

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar714
  • Electrical465
  • Roofing458
  • Battery storage18
  • Electric meters17
  • EV chargers3
  • Windows & doors1

Permit types

As the building departments classify them.

  • Electrical188
  • Electrical PV Solar139
  • Residential Solar - Expedited98
  • B-Add/Alt Solar Panel/Res70
  • RESIDENTIAL ELECTRICAL - SOLAR52
  • Residential Solar43
  • Solar Installation Permit38
  • Electrical Permit37

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 18, 2026Residential SolarResidential SolarBennett Town—
Apr 9, 2026Electrical Permit*Void - Customer no longer proceeding as contractor on project and new permit submitted. See ELE2026-00641* Install a 16.810 kW grid tied, roof flush mounted soBoulder$71,318
Apr 9, 2026Residential Roof Mounted Solar Electrical SystemSolar PV System - 10.660 kW Flush Mount, Grid Tied w/ Battery BackupBoulder County$41,299
Apr 8, 2026Electrical Permit*Withdrawn per property owner request* Install a 8.610 kW grid tied, roof flush mounted solar photovoltaic system. Includes a 13.5 kWh battery energy storage syBoulder$30,151
Apr 8, 2026Residential Roof Mounted Solar Electrical SystemSolar PV System - 11.480 kW Flush Mount, Grid Tied w/ Battery Backup & 125 Amp Sub PanelBoulder County$51,300
Apr 7, 2026Electrical Permit**Voided for inactivity - Requirements not received in 180 days.** Install a 5.330 kW grid tied, roof flush mounted solar photovoltaic system. Includes a main sBoulder$13,931
Apr 2, 2026Electrical Permit**Withdrawn per owner request. Letter in file. New permit submitted under different company, ELE2026-00723** ***REVISION 3/26/26-REV #1: Added Tesla Wall ConnecBoulder$28,255
Mar 27, 2026Electrical PV SolarInstall a 3.280 kW grid tied, roof flush mounted solar photovoltaic system.Thornton City$11,480

Permit status

Where its permits stand, as the departments report them.

  • Closed331
  • Issued107
  • Completed84
  • Not stated72
  • Expired54
  • Active39
  • Cancelled28
  • Void12

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • FREEDOM FOREVER COLORADO
  • FREEDOM FOREVER COLORADO LLC ELEC

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.