Contractor · Plumbing
BRUCE E BOTTICELLI
80 building permits since 2022 in Greenwich town, CT — $34,400 in reported job value over 16 permits that state one.
- Building permits
- 80
- Reported job value
- $34.4K
- Active
- 2022–2026
- Latest permit
- Aug 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT80
Permits by year
By issue date (application date where there is none).
012.525
22
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 12 |
| 2023 | 10 |
| 2024 | 18 |
| 2025 | 18 |
| 2026 (YTD) | 22 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing70
- Gas43
- Bathrooms41
- Pools & hot tubs24
- Generators14
- HVAC13
- Kitchens13
- New construction12
- Water heaters3
- Remodels1
Permit types
As the building departments classify them.
- PLU79
- PL21
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 10, 2026 | PLU | provide gas line for 400000 btu net gas pool heater | Greenwich Town | — |
| Aug 3, 2026 | PLU | install new toilet, lav, kitchen sink, d/w and bathtub with new valve all in same location. 1st fl.: rplc 1: wc, tub, dshwshr., rplc 2 snks. | Greenwich Town | — |
| Jul 8, 2026 | PLU | provide plumbing for pool house including sewage ejector pump. 1st fl.: 1 nw: wc, shower, 2 nw: snks. | Greenwich Town | — |
| Jul 2, 2026 | PLU | IN SLAB AND UNDERGROUND WORK ONLY: Install all underslab plumbing including 3 sump pumps, 1 sewage pump | Greenwich Town | — |
| May 12, 2026 | PLU | Unit C Apt#7. install new kitchen sink and faucet, 1 dw, 1 new tub and tub valves, 1 new toilet, new lav and faucet all in same location. 1st fl.: rplc 1: wc, t | Greenwich Town | — |
| May 12, 2026 | PLU | Unit C Apt#12. install new kitchen sink and faucet, 1 dw, 2 new tubs and tub valves, 2 new toilets, 2 new lavs, faucets all in same location. 2nd fl.: rplc 2: w | Greenwich Town | — |
| May 12, 2026 | PLU | Unit C Apt#10. install new kitchen sink and faucet, 1 d/w 1 new tub and tub valves, 1 new toilet, new lav and faucet all in same location. 1st fl: rplc 1: wc, t | Greenwich Town | — |
| May 12, 2026 | PLU | Unit C Apt#9. Install new kitchen sink and faucet, 1 dw, 2 new tubs, and tub valves, 2 new toilets, lave. and faucets all in same location. 2nd fl.: rplc 2: tub | Greenwich Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed56
- Active23
- Void1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.