Contractor · Electrical
Welsco, dba; Bulldog Energy Solutions
82 building permits since 2023 in Santa Fe city, NM — $331,399 in reported job value over 72 permits that state one.
- Building permits
- 82
- Reported job value
- $331.4K
- Active
- 2023–2026
- Latest permit
- Oct 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Santa Fe city, NM82
Permits by year
By issue date (application date where there is none).
01530
27
2023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 14 |
| 2024 | 17 |
| 2025 | 27 |
| 2026 (YTD) | 24 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical82
- EV chargers74
- Electric meters5
- Remodels1
Permit types
As the building departments classify them.
- Residential Electrical Trade Permit78
- Commercial Electrical Trade Permit3
- Other Remodel with Exterior Changes to Commercial Building1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 30, 2026 | Residential Electrical Trade Permit | To install 50-amp breaker in existing panel and run power to EV Charger | Santa Fe City | $2,000 |
| Oct 27, 2026 | Other Remodel with Exterior Changes to Commercial Building | TO PULL POWER FROM EXISTING PNM TRANSFORMER, SET NEW PANEL AND METER AND RUN POWER T (4) 50 AMP EV CHARGES (LEVEL 2) | Santa Fe City | $37,154 |
| Oct 15, 2026 | Residential Electrical Trade Permit | To install 50-amp breaker in existing panel and run power to EV Charger | Santa Fe City | $2,000 |
| Oct 7, 2026 | Residential Electrical Trade Permit | To install 50-amp breaker in existing panel and run power to EV Charger | Santa Fe City | $2,000 |
| Oct 3, 2026 | Residential Electrical Trade Permit | — | Santa Fe City | — |
| Oct 3, 2026 | Residential Electrical Trade Permit | To install 50-amp breaker in existing panel and run power to EV Charger | Santa Fe City | $2,000 |
| Oct 2, 2026 | Commercial Electrical Trade Permit | To pull 400 AMPS from XFMR Y5225 and run power 330' to MDP and set (4) CP6000 ChargePoint EV Chargers. We will install a 400 AMP panel near chargers with (4) 10 | Santa Fe City | $117,059 |
| Sep 30, 2026 | Commercial Electrical Trade Permit | Pulling power from XFMR P5330 and setting a 200 AMP meter combo on pedestal and running power to (4) 50AMP Level 2 EV Chargers | Santa Fe City | $45,000 |
Permit status
Where its permits stand, as the departments report them.
- Expired50
- Completed19
- Issued9
- Paid1
- Void1
- Cancelled1
- Pending payment1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.