Contractor · Electrical
Titan Solar Power
82 building permits since 2016 in Mesa city, AZ — $410,310 in reported job value over 78 permits that state one.
- Building permits
- 82
- Reported job value
- $410.3K
- Active
- 2016–2023
- Latest permit
- Oct 3, 2023
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ82
Permits by year
By issue date (application date where there is none).
02040
39
2016201920212023
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 2 |
| 2017 | 9 |
| 2019 | 6 |
| 2020 | 11 |
| 2021 | 39 |
| 2022 | 6 |
| 2023 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical79
- Solar43
- Battery storage18
- Electric meters9
- Generators1
Permit types
As the building departments classify them.
- Electrical66
- Res (OTH) -- Electrical10
- Single Family (Detached)5
- Com (OTH) -- Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 3, 2023 | Electrical | THIS PERMIT IS TO UPGRADE TO A 400A SERVICE PANEL AND 200A SUBPANEL INSTALLATION SHALL COMPLY WITH CITY OF MESA CODES AND SERVICING ELECTRIC UTILITY REQUIREMENT | Mesa | $2,600 |
| Jun 5, 2023 | Electrical | THIS PERMIT IS ONLY FOR THE INSTALLATION OF ONE (1) TESLA POWER WALL BACKUP GATEWAY 2. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. ENERGY BACK | Mesa | $14,500 |
| Jan 10, 2023 | Electrical | THIS PERMIT IS ONLY FOR THE INSTALLATION OF THE SOLAR BATTERY LG CHEM. ALL ELECTRICAL TO COMPLY WITH IRC 2018 AND SRP SPECIFICATIONS. SOLAR BATTERY BACK UP SYST | Mesa | $10,000 |
| Nov 16, 2022 | Electrical | Installation of 10k SE Energy Bank battery and 200a MPU | Mesa | $12,400 |
| Sep 26, 2022 | Electrical | Installation of Tesla power wall battery | Mesa | $10,000 |
| Jun 8, 2022 | Electrical | Installation of Tesla Powerwall battery for existing solar system | Mesa | $10,000 |
| May 17, 2022 | Electrical | Installation of 10kW generator for existing solar system | Mesa | $10,000 |
| May 17, 2022 | Electrical | THIS PERMIT IS ONLY FOR THE INSTALLATION Of ONE (1) LG CHEM ENERGY STORAGE SYTEMS AND BACKUP SYSTEM. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATION | Mesa | $10,000 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued63
- Finaled7
- Issued6
- Pending payment3
- Paid1
- Reviews in progress1
- Additional information required1
Also on file as
The same name elsewhere
- Titan Solar Power COThornton city, CO321
- TITAN SOLAR POWERSanta Fe city, NM100
- TITAN SOLAR POWERCopperas Cove city, TX59
- TITAN SOLAR POWERCoalinga city, CA34
- Titan Solar PowerBluffdale city, UT29
- Titan Solar PowerMcDowell County, NC13
- TITAN SOLAR POWERSt. Louis city, MO12
- Titan Solar PowerSt. Lucie County, FL10
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.