Contractor · Electrical

Mackenzie DeFrancisco

82 building permits since 2020 in Mesa city, AZ and Peoria city, AZ — $558,987 in reported job value over 59 permits that state one.

Building permits
82
Reported job value
$559K
Active
2020–2025
Latest permit
Dec 22, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ59
  • Peoria city, AZ23

Permits by year

By issue date (application date where there is none).

02040
32
20202021202320242025
View as table
YearPermits
20201
20211
20231
202420
202532

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical59
  • Solar53
  • Battery storage45
  • Electric meters42

Permit types

As the building departments classify them.

  • Electrical59
  • Residential23

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 22, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$12,500
Dec 1, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE SOLAR EDGE HOME BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILIMesa$10,500
Nov 20, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$10,000
Nov 3, 2025ElectricalPERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE SOLAREDGE HOME BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. Mesa$13,000
Oct 30, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$15,400
Oct 29, 2025ElectricalLike for like 400a main panel replacement due to thermal eventMesa$3,500
Oct 28, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$10,000
Oct 27, 2025ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$10,000

Permit status

Where its permits stand, as the departments report them.

  • C/o issued53
  • Expired19
  • Issued3
  • Pending payment3
  • Not stated2
  • Paid1
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.