Contractor · Specialty (solar, fire, telecom)

LUMINALT ENERGY CORP

82 building permits since 2014 in Marin County, CA; Los Altos Hills town, CA and San Bruno city, CA, across 5 counties — $4,136,022 in reported job value over 70 permits that state one.

Building permits
82
Reported job value
$4.1M
Active
2014–2026
Latest permit
Sep 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Marin County, CA62
  • Los Altos Hills town, CA7
  • San Bruno city, CA5
  • Contra Costa County, CA3
  • Fremont city, CA2
  • San Mateo County, CA1
  • Oakland city, CA1
  • Ross town, CA1

Permits by year

By issue date (application date where there is none).

07.515
15
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20142
20154
20163
20171
20183
201915
20206
202111
202213
20231
20248
20254
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar57
  • Battery storage40
  • Electrical12
  • EV chargers3
  • HVAC1
  • Roofing1
  • Plumbing1

Permit types

As the building departments classify them.

  • RESIDENTIAL62
  • Electrical5
  • RES_ALTERATION4
  • ELECTRICAL2
  • PVR2
  • CONVERTED1
  • E1
  • Electrical, Mechanical, Plumbi...1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 21, 2026RESIDENTIAL—Marin County$25,750
Sep 1, 2026PVRFOR 3947 HAPPY VALLEY RD UNIT A 5.72 KW (DC) PV residential roof mounted PV and ESS system; equipment includes (13) JA Solar JAM54-D4-440MB modules, (13) EnphasContra Costa County$65,155
Jun 11, 2026EInstalling a Tesla Universal Wall Connector (EV charger) with dynamic charging kitContra Costa County$2,500
May 8, 2026PVRResidential rooftop solar 18.920 kW (DC) PV & ESS installation; equipment includes (43) JA Solar JAM54-D41-440/MB modules, (2) Tesla Powerwall 3, (2) Tesla PoweContra Costa County$112,215
Mar 17, 2026ElectricalSymbium-project_69febf06-49bb-45ac-ace6-1c575b01df65:install 16 pv modules (7.04kw) with tesla inc. Inverter; install 1 ess unit, location = exterior side of exSan Mateo County—
Mar 13, 2026ElectricalInstalling 13.5 kwh battery energy storage system paired with existing solar pv system; equipment includes (1) tesla powerwall 3 battery & (1) tesla backup switFremont City—
Mar 7, 2026Electrical—Fremont City—
Mar 5, 2026ElectricalInstallation of roof mounted solar pv and solar storageRoss Town—

Permit status

Where its permits stand, as the departments report them.

  • Not stated70
  • Finaled9
  • Issued3

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • LUMINALT ENERGY CORPORATION
  • LUMINALT ENERGY

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.