Contractor · Electrical
SCHETTER ELECTRIC LLC
83 building permits since 2004 in Sacramento city, CA; Sacramento County, CA and Elk Grove city, CA, across 3 counties — $38,613,550 in reported job value over 81 permits that state one.
- Building permits
- 83
- Reported job value
- $38.6M
- Active
- 2004–2026
- Latest permit
- Jul 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA48
- Sacramento County, CA25
- Elk Grove city, CA5
- Davis city, CA3
- Chico city, CA1
- Citrus Heights city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2004 | 1 |
| 2011 | 2 |
| 2012 | 1 |
| 2014 | 1 |
| 2016 | 8 |
| 2017 | 4 |
| 2018 | 1 |
| 2019 | 5 |
| 2020 | 4 |
| 2021 | 13 |
| 2022 | 12 |
| 2023 | 9 |
| 2024 | 4 |
| 2025 | 8 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical55
- EV chargers14
- Demolition10
- HVAC8
- Remodels5
- Bathrooms2
- Plumbing2
- Windows & doors2
- Fire sprinklers2
- New construction2
Permit types
As the building departments classify them.
- Office19
- MISC17
- Other Struct (non-bldg)8
- EV Charging Station7
- CBNC5
- ELECTRICAL5
- Mix-Use5
- Industrial4
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 14, 2026 | MISC | Switchgear was damaged on first floor and is being replace/repaired. There are no changes being made to existing (previously submitted, permitted, and approved) | Sacramento County | $25,000 |
| May 14, 2026 | Other Struct (non-bldg) | EPC - 1.) Remove (1) 2,500A buss duct from switchboard #1 and replace it with 1,000A of temporary power via #4/0 DLO cable from switchboard #1 to a 1,000A tempo | Sacramento | $1,100,000 |
| Apr 7, 2026 | MISC | THE SCOPE OF THIS PROJECT IS LIMITED TO MISCELLANEOUS ELECTRICAL WORK WITHIN AN EXISTING BUILDING AS DETAILED IN THE ELECTRICAL DRAWINGS. NO NEW WORK OR ALTERAT | Sacramento County | $35,848 |
| Feb 17, 2026 | Other Struct (non-bldg) | EPC - INSTALLING (2) TWO NEW GATE OPERATORS TO SERVICE (2) TWO PROPOSED VEHICLE SLIDIDING GATES. THE SLIDING GATES WILL BE PART OF A NEW 6 FOOT HIGH WROUGHT IRO | Sacramento | $110,000 |
| Dec 29, 2025 | Industrial | EPC - EXPEDITED - INSTALL AND ANCHOR (5) PIECES OF EQUIPMENT IN EXISTING WAREHOUSE SPACE WITH REQUIRED ELECTRICAL, WATER, AND COMPRESSED AIR HOOKUPS. ROUGHLY 87 | Sacramento | $202,000 |
| Dec 12, 2025 | MISC | Provide Labor and Material to demo existing lighting and lighting circuitry. Provide and install (103) new LED high-bay fixtures with individual motion controls | Sacramento County | $134,668 |
| Sep 9, 2025 | MISC | Demo existing (1) 800A 480V panel, (1) 225 KVA Transformer and (1) 800A 208V Panel. Intercept 800A Feeder between B&C bay. Install (1) new 400A 480V panel, (1) | Sacramento County | $611,122 |
| Mar 15, 2025 | CBNC | The scope of this project is an electrical modification at an existing site. These electrical drawings indicate the general scope of the project in terms of ele | Sacramento County | $116,995 |
Permit status
Where its permits stand, as the departments report them.
- Issued52
- Completed12
- Finaled8
- Closed5
- C/o issued2
- Stop work ordered2
- Expired1
- Revoked1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.