Contractor · Plumbing
Joe McClellan
83 building permits since 2018 in Boston city, MA; Andover town, MA and Methuen city, MA, across 6 counties — $2,941,600 in reported job value over 77 permits that state one.
- Building permits
- 83
- Reported job value
- $2.9M
- Active
- 2018–2026
- Latest permit
- Oct 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boston city, MA47
- Andover town, MA12
- Methuen city, MA3
- Somerville city, MA3
- Westford town, MA3
- Newburyport city, MA2
- Littleton town, MA2
- Tewksbury town, MA2
- Haverhill city, MA1
- Ipswich town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2020 | 2 |
| 2021 | 24 |
| 2022 | 15 |
| 2023 | 26 |
| 2024 | 8 |
| 2025 | 4 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC36
- Gas35
- Plumbing29
- Heat pumps10
- Water heaters6
- Remodels2
- Accessory dwelling units1
- Kitchens1
- Roofing1
- Additions1
Permit types
As the building departments classify them.
- GAS25
- PLUMBING22
- Mechanical Permit6
- Gas Permit5
- Plumbing Permit5
- Sheet Metal Permit4
- Sheet Metal / Mechanical3
- Sheet Metal Permit / Mechanical Permit (use for mini-splits)2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 26, 2026 | Sheet Metal Permit | installation of new trane 3 ton ducted heat pumpo system with new duct work to provid heat/ac to main fl | Fitchburg City | $15,000 |
| Aug 19, 2026 | Mechanical Permit | installation of new ductless mini split for addition ALL WORK MUST CONFORM WITH 780 CMR - A FINAL INSPECTION IS REQUIRED. | Littleton Town | $12,000 |
| Jun 1, 2026 | Mechanical Permit | installation of new daiken 3 zone ductless system for 3rd floor ALL WORK MUST CONFORM WITH 780 CMR - A FINAL INSPECTION IS REQUIRED. | Littleton Town | $10,500 |
| Dec 23, 2025 | Mechanical Permit | installation of new furnace and ductwork for rennovation of existing home and installation of new heat pump system for new above garage adu | Andover Town | $54,000 |
| Aug 25, 2025 | Sheet Metal Permit | installation of 3 zone samsung ductless mini split system to provide cooling for 2nd floor bed area , kitchen and living room | Quincy City | $12,500 |
| Aug 20, 2025 | Building Permit | Installation of new Mitsubishi hyper heat 8 zone ductless heat pump system | Salem City | $26,000 |
| Jun 20, 2025 | Sheet Metal Permit -TEWKSBURY | removal of old gas furnace ,installation of new gas furnace with ac coil and condesing unit with new duct work to provide heat/ac to 1st and 2nd fl | Tewksbury Town | $15,000 |
| Dec 2, 2024 | Sheet Metal Permit -TEWKSBURY | Install installation of new ductwork per mechanical drawings - per contract | Tewksbury Town | $126,000 |
Permit status
Where its permits stand, as the departments report them.
- Closed35
- Active24
- Completed19
- Issued4
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.