Contractor · Electrical
CLEAN ENERGY SOLUTIONS INC
788 building permits since 2009 in Los Angeles city, CA; San Diego County, CA and Riverside city, CA, across 18 counties — $126,183,998 in reported job value over 124 permits that state one.
- Building permits
- 788
- Reported job value
- $126.2M
- Active
- 2009–2026
- Latest permit
- Oct 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA530
- San Diego County, CA35
- Riverside city, CA35
- Norwalk city, CA34
- Madera city, CA26
- Oceanside city, CA22
- Merced city, CA14
- Kings County, CA13
- Vista city, CA11
- Coalinga city, CA9
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2009 | 4 |
| 2010 | 1 |
| 2011 | 2 |
| 2013 | 1 |
| 2014 | 15 |
| 2015 | 110 |
| 2016 | 101 |
| 2017 | 38 |
| 2018 | 49 |
| 2019 | 113 |
| 2020 | 59 |
| 2021 | 144 |
| 2022 | 40 |
| 2023 | 28 |
| 2024 | 28 |
| 2025 | 12 |
| 2026 (YTD) | 38 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical589
- Solar344
- Roofing71
- Plumbing25
- Battery storage23
- HVAC20
- Gas15
- Electric meters13
- New construction8
- Windows & doors5
Permit types
As the building departments classify them.
- Electrical511
- Residential25
- Existing24
- Solar Panel14
- 340-R13
- BLD SOLAR PV RES12
- Bldg-Alter/Repair11
- Building Misc - Photovoltaic System (PV)11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 16, 2026 | Residential | INSTALL PV SOLAR SYSTEM WITH (11) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 4.73 KW DC & (1) TESLA POWERWALL 3 | Riverside City | $26,112 |
| Jun 3, 2026 | Single Family | Electrical Permit: Existing panel 100 Amps - Overhead service, new main panel 200 Amps, Reuse existing weather head/masthead work, main breaker replacement. Car | Sacramento | $2,400 |
| Jun 1, 2026 | Single Family | E-Permit: Tear Off - Yes, Resheet - Yes, 1 layer(s), 20 squares of Composite Class A. In-progress inspection required if 10 squares or greater. | Sacramento | $17,400 |
| May 8, 2026 | SFD SOLAR APP PLUS WITH ESS | Roof mount installation of 4.51kW PV System with ESS | Oceanside City | — |
| May 4, 2026 | PVR | Roof mount PV System: 11 Q.PEAK DUO BLK ML-G10.C+ 410 solar modules 1 1707000-XX-Y {11.5kW} inverter 1 1707000-XX-Y {11.5kW} ESS System Size: 4.51 kW DC Site Ad | Contra Costa County | $176,000 |
| Apr 9, 2026 | Residential | UPGRADE ELECTRIC SERVICE (METER) PANEL TO 200 AMPS | Riverside City | $2,500 |
| Apr 3, 2026 | Single Family | Reviewed by SolarApp+ 6kw Solar PV System, 13.5 kw PV Storage System Size and nullgal Solar WH System (water heater installed null)., Main Service Panel Upgrade | Sacramento | $21,500 |
| Mar 27, 2026 | RESPVSOLAR | RES PV SOLAR 6.88KW DC | ESS 200 AMP MPU | Madera City | $2,500 |
Permit status
Where its permits stand, as the departments report them.
- Not stated533
- Finaled93
- Issued49
- Completed48
- Expired39
- Active12
- Withdrawn5
- C/o issued3
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- CLEAN ENERGY SOLUTIONS OF CALIFORNIA LLC
- CLEAN ENERGY SOLUTIONS
- CLEAN ENERGYZ LLC
- CLEAN ENERGY
- CLEAN ENERGY SOLUTIONS OF CALI
- CLEAN ENERGY CONSTRUCTION
- CLEAN ENERGY SOLU
- CLEAN ENERGY SOLUTIONS INC DBA CES CONSTRUCTION
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.