Contractor · Electrical

Derrick J Bonano

85 building permits since 2012 in Orleans Parish, LA.

Building permits
85
Reported job value
—
Active
2012–2026
Latest permit
Jul 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA85

Permits by year

By issue date (application date where there is none).

012.525
21
20132016201920232026*
* 2026 is year to date.
View as table
YearPermits
20122
20138
201421
20156
20163
20178
20187
20192
20203
20216
20231
20245
20259
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical48
  • Remodels25
  • Generators9
  • Electric meters8
  • Kitchens3
  • Bathrooms3
  • HVAC2
  • Additions2
  • New construction1

Permit types

As the building departments classify them.

  • Accessory Structure1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 24, 2026—Install 1 - 50 amp circuit for a new A/C condenser and 1 - 20 amp circuit for a new AHU.Orleans Parish—
Jun 1, 2026—Construction Loop, temp poleOrleans Parish—
May 17, 2026—Repair minor fire damage and inspect all wiring that was exposed when the fire department opened the wall. A meter release will be required.Orleans Parish—
Mar 3, 2026—Electrical renovation and bedroom addition. One new circuit for bathroom, relocate and add lighting and outlets.Orleans Parish—
Dec 23, 2025—One leg in a tap box at the service burnt up. The connection was remade with a clear tap block. Entergy had already pulled the jacks on the pole and killed poweOrleans Parish—
Dec 22, 2025—Remove and replace light fixtures throughout the garage. No new circuits or breaker panels. Exceeding the scope of the permit or failure to obtain the proper buOrleans Parish—
Oct 9, 2025—Electrical VacancyOrleans Parish—
Oct 8, 2025—Tenant office build out. Add outlets, remove and replace all lights, modify wiring. The service and breaker panel are existing to remain. No meter release is neOrleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Issued34
  • Not stated28
  • C/o issued12
  • Finaled6
  • Closed4
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.