Contractor · Electrical

J. A. FLOYD, INC

86 building permits since 2015 in Citrus County, FL and Crystal River city, FL — $127,916 in reported job value over 21 permits that state one.

Building permits
86
Reported job value
$127.9K
Active
2015–2026
Latest permit
Sep 15, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Citrus County, FL60
  • Crystal River city, FL26

Permits by year

By issue date (application date where there is none).

02040
33
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20151
20182
20194
20201
20214
20224
20239
20248
202520
2026 (YTD)33

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical43
  • HVAC39
  • Heat pumps19
  • Electric meters13
  • Generators8
  • Gas5
  • New construction4
  • EV chargers3
  • Pools & hot tubs3
  • Solar2

Permit types

As the building departments classify them.

  • Electrical37
  • Mechanical30
  • AC Change Out Residential Express6
  • Generator5
  • Residential3
  • Com - Mechanical2
  • Accessory Structure1
  • Pool-Spa1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 15, 2026AC Change Out Residential Express2 Ton heat pump AC System change out (Runtru)Citrus County—
Sep 8, 2026GeneratorInstallation of a 24KW generator. Tying into existing 200A 120/240v ATS and service ** SITE REVIEW APPROVED FOR GENERATOR ONLY. GENERATOR MUST NOT ENCROACH EASECitrus County—
Aug 13, 2026MechanicalChange out two existing 2 ton mini split systems for 2 new 2 ton mini split systems that can be powered by either standard electric connection or solar power. ICitrus County—
Aug 4, 2026GeneratorInstall 26 KW Generac Generator and automatic transfer switch**SEPARATE PERMIT REQUIRED FOR GAS** /  ***SITE REVIEW APPROVED - INSPECTOR TO VERIFY GENERATOCitrus County—
Jul 27, 2026AC Change Out Residential ExpressChange out existing 3 ton split system for new 3 ton heat pump split systemCitrus County—
Jul 21, 2026MechanicalAdd supplemental air conditioning system with ductwork in garage area.Citrus County—
Jul 20, 2026AC Change Out Residential ExpressChange out existing 5 ton heat pump split system for new heat pump split systemCitrus County—
Jul 20, 2026AC Change Out Residential ExpressChange out 2 ton heat pump for new 2 ton heat pump systemCitrus County—

Permit status

Where its permits stand, as the departments report them.

  • Closed46
  • Finaled19
  • Issued13
  • Expired5
  • Cancelled2
  • Abandoned1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.