Contractor · Electrical

Anthony Tucciarone

86 building permits since 2023 in Providence city, RI; Lincoln town, RI and Pawtucket city, RI, across 5 counties — $6,815,971 in reported job value over 80 permits that state one.

Building permits
86
Reported job value
$6.8M
Active
2023–2026
Latest permit
Oct 19, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI22
  • Lincoln town, RI13
  • Pawtucket city, RI8
  • West Warwick town, RI7
  • Smithfield town, RI5
  • Woonsocket city, RI5
  • North Providence town, RI4
  • Warwick city, RI3
  • Newport city, RI3
  • North Kingstown town, RI3

Permits by year

By issue date (application date where there is none).

01530
26
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
202323
202423
202526
2026 (YTD)14

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical80
  • HVAC26
  • Remodels9
  • New construction7
  • Generators5
  • Telecom4
  • Plumbing4
  • Demolition4
  • Water heaters4
  • Solar3

Permit types

As the building departments classify them.

  • Electrical Permit80
  • Fire Alarm Permit5
  • Solar Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 19, 2026Fire Alarm PermitProvide BDA survey, design services, and complete installation of a BDA system for the Joslin Rec Center. The system is designed and calculated to be able to coProvidence City$98,000
Sep 1, 2026Electrical PermitProvide new 2000A 480V/277V 3Phase electrical service, switchboard, distribution panels, step down transformers, and subpanels. Provide temporary lighting / powProvidence City$600,000
Sep 1, 2026Fire Alarm PermitProvide new building addressable fire alarm system with VOICE EVAC and BDA system (as required by RF Survey)Providence City$450,000
Aug 20, 2026Electrical PermitProvide new PA system, including power and fire alarm connectionsProvidence City$1,000
Jul 28, 2026Electrical Permit—Westerly Town—
Jul 13, 2026Electrical PermitProvide electrical conduit, cabling, device install, and terminations for the HVAC temperature controls / BMS equipment and systems upgrades furnished by othersMiddletown Town$50,000
May 28, 2026Fire Alarm PermitModify existing fire alarm system, reutilize / relocate existing SLC and NAC devices as required per plans, provide new SLC and NAC devices where indicated in pProvidence City$50,000
May 11, 2026Electrical PermitFurnish and install temperature controls conduit, cabling, and devices associated with the renovations / HVAC upgrades at 30 Payan Street.West Warwick Town$50,000

Permit status

Where its permits stand, as the departments report them.

  • Completed58
  • Active27
  • Stop work ordered1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.