Contractor · Electrical

Edward Kennie

87 building permits since 2010 in Boston city, MA; Marlborough city, MA and Andover town, MA, across 7 counties — $1,996,574 in reported job value over 77 permits that state one.

Building permits
87
Reported job value
$2M
Active
2010–2026
Latest permit
Sep 11, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boston city, MA16
  • Marlborough city, MA15
  • Andover town, MA11
  • Quincy city, MA7
  • Littleton town, MA5
  • Canton town, MA4
  • Somerville city, MA3
  • Tewksbury town, MA3
  • Franklin Town city, MA3
  • Bourne town, MA2

Permits by year

By issue date (application date where there is none).

01020
18
201020142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20102
20112
20131
20141
20152
20161
20173
20184
201910
20203
20213
202218
20238
202412
202511
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical66
  • Demolition7
  • Remodels6
  • HVAC4
  • Kitchens2
  • Additions2
  • Generators2
  • Electric meters2
  • Battery storage1
  • Roofing1

Permit types

As the building departments classify them.

  • Electrical Permit25
  • ELECTRICAL14
  • Building Permit9
  • Electrical Permit - Commercial9
  • ELECT.4
  • Fire Alarm Permit4
  • Franklin Electrical Permit3
  • Building Permit Application2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 11, 2026FIRE ALARM AND SPRINKLER WORK PERMITInstall onerelocate three (3) horn/strobesTewksbury Town—
Jul 8, 2026Building PermitPhase 1B: install three (3) smoke detectors, five (5) wall mount horn/strobes, six (6) ceiling mount horn/strobes, two (2) strobe onlys, and one (1) remote annuAndover Town$10,000
Jul 6, 2026Electrical PermitDemo and renovation of zones 2-5 (phase 1B of Lockheed Martin project). Install lights, outlets, switches, wiremold, wiring, panels, and disconnects per prints;Andover Town$350,000
Jun 25, 2026Building PermitInstall three (3) horn/strobes and one (1) strobe only (relocate existing celing strobes to wall mount).Andover Town$10,000
May 19, 2026Electrical PermitRenovations for Lockheed Martin Zone 1 - Phase 1A: Demo and make safe per prints, install outlets, wiremold and new circuits for outlets and vacuum system; wireAndover Town$60,000
Jan 15, 2026*Electrical PermitReplace damaged breaker and damaged relays, inspect and replace any damaged wiring, relocate two pull stations due to damage, replace one horn/strobeNorth Andover Town$15,000
Jul 30, 2025Electrical Permit - Commercial—Marlborough City$2,500
Jul 29, 2025*Electrical PermitInstall two (2) 400a 480v three-phase feeds and one (1) 120v feed and one (1) network line for new hydraulic motor skid (2 motors, 200 hp each)North Andover Town$50,000

Permit status

Where its permits stand, as the departments report them.

  • Completed48
  • Active29
  • Closed4
  • Issued4
  • Finaled1
  • Pending1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.