Contractor · Specialty (solar, fire, telecom)

BRIGHT PLANET

811 building permits since 2018 in San Diego County, CA; Los Angeles city, CA and Riverside city, CA, across 15 counties — $1,654,616 in reported job value over 84 permits that state one.

Building permits
811
Reported job value
$1.7M
Active
2018–2026
Latest permit
Mar 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA455
  • Los Angeles city, CA122
  • Riverside city, CA70
  • Moreno Valley city, CA22
  • Santa Rosa city, CA20
  • Redlands city, CA12
  • Concord city, CA10
  • Jurupa Valley city, CA9
  • Ontario city, CA9
  • Lancaster city, CA7

Permits by year

By issue date (application date where there is none).

0125250
231
2019202120232026*
* 2026 is year to date.
View as table
YearPermits
20181
201914
202031
2021176
2022190
2023231
20241
2026 (YTD)150

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar639
  • Electrical424
  • Battery storage149
  • Roofing47
  • Electric meters11
  • EV chargers3
  • Grading & excavation1
  • Additions1

Permit types

As the building departments classify them.

  • Electrical266
  • Residential67
  • B-BSP Solar12
  • ELECTRICAL6
  • BRES3
  • Nonbldg-New1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 27, 2026ElectricalRevision to b253976: solar roof mount,3.24kw,8modules,1tesla powerwall 3 battery w/buiConcord City—
Mar 27, 2026ElectricalSolar app plus project id: sa20260327-6288-45-563-a scope: pv solar and storage pv system size: 3.28 kw dc (8) pv modules: q.peak duo blk ml-g10.c+ 415 (1) invePlacer County—
Mar 27, 2026ElectricalResidential roof-mounted solar: 5.74kw/dc, 11.5kw/ac, 14 mods, 1 inverter, backup switch.Eastvale City—
Mar 27, 2026ElectricalReplace existing electrical main panel with new 100a mpu - separate solar & ess permit b26-1485.Santa Rosa City—
Mar 24, 2026ElectricalPv solar roof mounts, 4.1kw, 10panels, comp-shingle, main panel upgrade 200a 1-tesla powerwall 3Tehachapi City—
Mar 23, 2026ElectricalE-permit: solar app application id - sa20260323-150-174-563-a, residential - 3.645kw photovoltaic system main breaker replacement: - no, battery backup units: -Stockton City—
Mar 23, 2026ElectricalE-permit: solar app application id - sa20260323-150-172-563-a, residential - 3.28kw photovoltaic system main breaker replacement: - no, main service panel replaStockton City—
Mar 23, 2026ElectricalSymbium-project_a2456cb4-e244-4608-8b29-727fe4440194:install 8 pv modules (3.24kw) with tesla inc. InverterPittsburg City—

Permit status

Where its permits stand, as the departments report them.

  • Issued270
  • Active263
  • Not stated118
  • Finaled88
  • Completed44
  • Expired10
  • Additional information required8
  • Closed5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.