Contractor · Specialty (solar, fire, telecom)
Nicholas Armstrong
813 building permits since 2011 in Norwalk city, CA and Riverside County, CA, across 2 counties.
- Building permits
- 813
- Reported job value
- —
- Active
- 2011–2026
- Latest permit
- Aug 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Norwalk city, CA812
- Riverside County, CA1
Permits by year
By issue date (application date where there is none).
0150300
274
20142017202020232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2011 | 1 |
| 2013 | 15 |
| 2014 | 79 |
| 2015 | 211 |
| 2016 | 274 |
| 2017 | 71 |
| 2018 | 34 |
| 2019 | 17 |
| 2020 | 16 |
| 2021 | 28 |
| 2022 | 9 |
| 2023 | 26 |
| 2024 | 14 |
| 2025 | 13 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar727
- Electrical385
- Roofing170
- Battery storage64
- Windows & doors5
- Additions3
- EV chargers3
- Electric meters3
- HVAC2
- Remodels2
Permit types
As the building departments classify them.
- Solar Panel311
- Electrical Residential solar panel216
- Solar Panel - Residential & PC174
- Residential Electrical88
- Solar Permit16
- Electrical2
- Electrical Commercial solar panel2
- Residential Remodel2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 10, 2026 | Solar Permit | 7.98KW PV ARRAY 2 ENERYG STORAGE SYSTEMS BACKUP SWITCH | Norwalk City | — |
| Mar 25, 2026 | Solar Permit | 4.62KW PV ARRAY 1 ENERGY STORAGE SYSTEM BACKUP SWITCH | Norwalk City | — |
| Feb 20, 2026 | Residential Electrical | INSTALL (1) ENERGY STORAGE SYSTEM - 200A INTERNAL LOAD CENTER - 125A DISTRIBUTION PANEL | Norwalk City | — |
| Jan 14, 2026 | Electrical | Adding 5.46kw 13 panels 27kwh energy storage system “back up battery” end-fed no mpu to existing pv system | Riverside County | — |
| Jan 9, 2026 | Residential Electrical | INSTALL (1) ELECTRIC VEHICLE CHARGER - EXTERIOR WALL-MOUNTED | Norwalk City | — |
| Dec 29, 2025 | Solar Permit | 4.2KW PV ARRAY 1 ENERGY STORAGE SYSTEM 200A INTERNAL LOAD CENTER MAIN BREAKER DERATE | Norwalk City | — |
| Dec 12, 2025 | Solar Permit | 6.3KW PV ARRAY 2 ENERGY STORAGE SYSTEMS | Norwalk City | — |
| Nov 23, 2025 | Solar Permit | 4.2KW PV ARRAY 1 ENERGY STORAGE SYSTEM | Norwalk City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed740
- Finaled72
- Active1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.