Contractor · Specialty (solar, fire, telecom)

BLALOCK ELECTRIC & SOLAR INC

819 building permits since 2015 in San Diego County, CA; Oceanside city, CA and Los Angeles city, CA, across 5 counties — $981,007 in reported job value over 46 permits that state one.

Building permits
819
Reported job value
$981K
Active
2015–2026
Latest permit
Aug 18, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA370
  • Oceanside city, CA166
  • Los Angeles city, CA97
  • Temecula city, CA65
  • Vista city, CA44
  • Riverside city, CA33
  • Norwalk city, CA14
  • Redlands city, CA13
  • Murrieta city, CA3
  • San Diego city, CA3

Permits by year

By issue date (application date where there is none).

0125250
205
201620182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20157
201620
201710
201855
2019111
2020140
2021116
202296
2023205
202420
202513
2026 (YTD)25

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar652
  • Electrical191
  • Roofing97
  • Battery storage52
  • Electric meters5
  • Remodels1
  • Additions1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical109
  • BLD SOLAR PV RES63
  • BLDG - Building (R)55
  • SFD SOLAR PV52
  • Building Misc - Photovoltaic System (PV)41
  • Residential20
  • BRES13
  • B-BSP Solar12

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 18, 2026ResidentialUPGRADE AND RELOCATE ELECTRICAL SERVICE METER PANEL TO 225/200ARiverside City$500
Aug 11, 2026ResidentialINSTALL PV SOLAR SYSTEM WITH (13) PHOTOVOLTAIC PANELS ON RESIDENTIAL - 5.33 KW (1) ENERGY STORAGE SYSTEMRiverside City$46,005
Jun 30, 2026ResidentialINSTALL PV SOLAR SYSTEM WITH (16) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 6.560 KW (1) ENERGY STORAGE SYSTEMRiverside City$51,816
Jun 12, 2026Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / ENERGY STORAGE SYSTEMVista City—
May 14, 2026SFD SOLAR PV - ENERGY STORAGE SYSTEMORIGINAL PV FINALED, CHANGING INVERTER TO TESLA PW3.Oceanside City—
Mar 30, 2026SFD SOLAR PV - PANEL UPGRADE4.86kW Roof PV SYS., 12 MODS/1 INV, & 200A MPUOceanside City—
Mar 27, 2026ElectricalMeter is 100/100, not 225/200.Whittier City—
Mar 16, 2026ElectricalUpgrade panel to 200 amp with surge protector. Supplemental to permit so26-0633Whittier City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled271
  • Issued166
  • Active149
  • Completed126
  • Not stated101
  • Expired4
  • Cancelled1
  • Withdrawn1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • BLALOCK ELECTRIC SOLAR
  • BLALOCK ELECTRIC AND SOLAR
  • BLALOCK ELECTRIC SOLAR INC

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.