Contractor · Electrical

SUNERGY INC.

89 building permits since 2023 in Los Angeles city, CA; Sacramento city, CA and Riverside city, CA, across 12 counties — $827,245 in reported job value over 41 permits that state one.

Building permits
89
Reported job value
$827.2K
Active
2023–2026
Latest permit
Aug 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA15
  • Sacramento city, CA9
  • Riverside city, CA7
  • Sacramento County, CA6
  • Oceanside city, CA5
  • Scotts Valley city, CA5
  • Fremont city, CA4
  • Mountain View city, CA4
  • Concord city, CA3
  • Elk Grove city, CA3

Permits by year

By issue date (application date where there is none).

02550
49
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20232
20247
202529
2026 (YTD)49

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar76
  • Electrical48
  • Battery storage26
  • Roofing12
  • Plumbing9
  • Water heaters9
  • EV chargers2
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical37
  • Residential8
  • Single Family5
  • Electrical Permit4
  • SolarApp4
  • Solar System4
  • SFD SOLAR PV - ENERGY STORAGE SYSTEM3
  • BL, CH, EL2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 24, 2026ELSOLARAPP+ SA20260821-5854-63-9982-A: INSTALL ROOFTOP PHOTOVOLTAIC SYSTEM (10.12 KW) & (2) ENERGY STORAGE SYSTEM (10 KWH)Mountain View City$2,000
Aug 20, 2026BuildingSA20260820-13510-10-9982-A Rooftop Mounted Solar Energy System PV+ST 17 REC460AA Pure-RX-DC solar modules 17 IQ8X-80-M-DOM-US {240V} microinverters 1 IQBATTERY-Capitola City$21,888
Aug 6, 2026Single Family0kw Solar PV System, 20 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, Sacramento$16,000
Jul 28, 2026Electrical PermitAdd 1 ESS to an existing solar PV system.Scotts Valley City$13,000
Jul 23, 2026EPG&E requested site changes after permit BIPVR25-013240 was finaled and closed. Need new sign off for AC disconnect added after previous inspection.Contra Costa County$250
Jul 23, 2026PVR16.1 kW DC Solar PV (35) REC SOLAR REC460AA PURE-RX MODULES (35) ENPHASE ENERGY INC. IQ8X-80-M- US [240V] MICROINVERTERS (1) ENPHASE ENERGY INC. IQBATTERY-10C-1Contra Costa County$47,115
Mar 30, 2026ElectricalPv solar with energy storage system with a photovoltaic facility rating of 13.68 kw.Santa Clara County—
Mar 12, 2026ElectricalRooftop mounted solar energy system pv 20 rec460aa pure-rx solar modules 20 iq8x-80-m-us {240v} microinverters new busbar count - 1 system size: 9.2 kw dc (7.6 Oakland City—

Permit status

Where its permits stand, as the departments report them.

  • Active27
  • Issued19
  • Finaled17
  • Not stated9
  • Closed8
  • Completed7
  • Additional information required2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

SUNERGY INC. — Building Permits & Contractor Profile | Buildstats