Contractor · Electrical
CALIFORNIA RENEWABLE ENERGY
90 building permits since 2021 in Sacramento County, CA; Sacramento city, CA and Citrus Heights city, CA, across 9 counties — $2,084,416 in reported job value over 81 permits that state one.
- Building permits
- 90
- Reported job value
- $2.1M
- Active
- 2021–2026
- Latest permit
- Oct 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA43
- Sacramento city, CA18
- Citrus Heights city, CA11
- Amador County, CA4
- Tuolumne County, CA3
- Marin County, CA2
- Placer County, CA2
- Elk Grove city, CA2
- Stockton city, CA2
- Chico city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 8 |
| 2022 | 5 |
| 2023 | 13 |
| 2024 | 11 |
| 2025 | 20 |
| 2026 (YTD) | 27 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical38
- Solar26
- Plumbing26
- HVAC25
- Roofing21
- Water heaters11
- Battery storage5
- Heat pumps5
- Accessory dwelling units2
- Gas2
Permit types
As the building departments classify them.
- MISR22
- Single Family18
- HACR9
- RRZR7
- Reroof6
- Electrical5
- Roofing4
- COXX2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 14, 2026 | ONLINE SOLAR PHOTOVOLTAIC PERMITS | Installing ESS only 1 - Tesla PW 3 & 1 - Tesla Expansion Pac | Elk Grove City | $35,149 |
| Oct 14, 2026 | ONLINE SOLAR PHOTOVOLTAIC PERMITS | Installing ESS only 1-Tesla PW3 & 1-Tesla Expansion Pack | Elk Grove City | $34,800 |
| Oct 12, 2026 | MISR | Install ESS system (1-Tesla PW3 & 1-Tesla Expansion Pack) adding to (E) solar system | Sacramento County | $33,400 |
| Oct 6, 2026 | MISR | Installing 1 Tesla PW3 & 1 Tesla expansion pack to (E) solar | Sacramento County | $34,150 |
| Sep 25, 2026 | MISR | Installing 1 Tesla PW3 & 1 Expansion pack to (E) solar | Sacramento County | $33,400 |
| Sep 24, 2026 | Single Family | 0kw Solar PV System, 27 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, | Sacramento | $32,400 |
| Sep 23, 2026 | Single Family | 0kw Solar PV System, 27 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, | Sacramento | $34,150 |
| Sep 22, 2026 | Single Family | 0kw Solar PV System, 27 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, | Sacramento | $34,200 |
Permit status
Where its permits stand, as the departments report them.
- Issued34
- Completed20
- Finaled15
- Not stated9
- Cancelled6
- Additional information required3
- Reviews in progress2
- Documents submitted1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.