Contractor · Electrical

PROGREEN SOLAR LLC

91 building permits since 2020 in Boulder city, CO; Boulder County, CO and Broomfield County, CO, across 3 counties — $1,954,796 in reported job value over 85 permits that state one.

Building permits
91
Reported job value
$2M
Active
2020–2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO64
  • Boulder County, CO17
  • Broomfield County, CO6
  • Adams County, CO2
  • Commerce City city, CO1
  • Northglenn city, CO1

Permits by year

By issue date (application date where there is none).

01530
30
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20208
20217
20228
20238
202422
202530
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical82
  • Solar68
  • Battery storage18
  • Roofing17
  • Remodels2
  • Additions1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical Permit64
  • Residential Roof Mounted Solar Electrical System10
  • B-Add/Alt Solar Panel/Res5
  • Electrical Battery Backup5
  • Residential Solar2
  • B-Add/Alt Solar PV Remove/Replace1
  • Electrical Other1
  • Electrical Service Change1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2026Electrical Permit(22) HD HYUNDAI HIN-T440NF(BK) (440W) (1) TESLA POWERWALL 3 (11.5 KW) INVERTERBoulder$43,983
Sep 15, 2026B-Add/Alt Solar PV Remove/ReplaceSolar Remove/ReinstallBroomfield County—
Sep 8, 2026Electrical Permit**REVISION 10/2/26-Changed AC disco to non-fused and interconnection to backfed breaker. (8) HD HYUNDAI HIN-T440NF(BK) (440W) TESLA POWERWALL 3 (11.5 KW) INVERTBoulder$25,995
Aug 31, 2026Electrical PermitPrevious PV removed and not replaced. Install (27) HD HYUNDAI HIN-T440NF(BK)(440W) SOLAR, (1) TESLA POWERWALL, and 3 (11.5 KW) INVERTERS.Boulder$49,898
May 26, 2026Electrical Battery BackupInstall Battery Backup System (Existing PV BP-24-2086)Boulder County$15,971
May 12, 2026Residential Roof Mounted Solar Electrical SystemSolar PV System - 12.60 kW Flush Tied, Grid Tied On Detached GarageBoulder County$44,448
Apr 14, 2026Electrical Permit**VOID-SEE RFG2026-00327** Detach/Reset of existing solar panels for re-roof project.Boulder$2,250
Mar 25, 2026Electrical Permit***REVISION 3/27/26-E-stop added to Electrical Line Diagram. Only adding Tesla Powerwall 3 Battery to existing solar system **PV installed under ELE2023-01274Boulder$15,000

Permit status

Where its permits stand, as the departments report them.

  • Completed73
  • Void6
  • Not stated6
  • Issued2
  • Active1
  • Closed1
  • Finaled1
  • Pending1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.