Contractor · Electrical
PROGREEN SOLAR LLC
91 building permits since 2020 in Boulder city, CO; Boulder County, CO and Broomfield County, CO, across 3 counties — $1,954,796 in reported job value over 85 permits that state one.
- Building permits
- 91
- Reported job value
- $2M
- Active
- 2020–2026
- Latest permit
- Oct 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boulder city, CO64
- Boulder County, CO17
- Broomfield County, CO6
- Adams County, CO2
- Commerce City city, CO1
- Northglenn city, CO1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 8 |
| 2021 | 7 |
| 2022 | 8 |
| 2023 | 8 |
| 2024 | 22 |
| 2025 | 30 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical82
- Solar68
- Battery storage18
- Roofing17
- Remodels2
- Additions1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical Permit64
- Residential Roof Mounted Solar Electrical System10
- B-Add/Alt Solar Panel/Res5
- Electrical Battery Backup5
- Residential Solar2
- B-Add/Alt Solar PV Remove/Replace1
- Electrical Other1
- Electrical Service Change1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2026 | Electrical Permit | (22) HD HYUNDAI HIN-T440NF(BK) (440W) (1) TESLA POWERWALL 3 (11.5 KW) INVERTER | Boulder | $43,983 |
| Sep 15, 2026 | B-Add/Alt Solar PV Remove/Replace | Solar Remove/Reinstall | Broomfield County | — |
| Sep 8, 2026 | Electrical Permit | **REVISION 10/2/26-Changed AC disco to non-fused and interconnection to backfed breaker. (8) HD HYUNDAI HIN-T440NF(BK) (440W) TESLA POWERWALL 3 (11.5 KW) INVERT | Boulder | $25,995 |
| Aug 31, 2026 | Electrical Permit | Previous PV removed and not replaced. Install (27) HD HYUNDAI HIN-T440NF(BK)(440W) SOLAR, (1) TESLA POWERWALL, and 3 (11.5 KW) INVERTERS. | Boulder | $49,898 |
| May 26, 2026 | Electrical Battery Backup | Install Battery Backup System (Existing PV BP-24-2086) | Boulder County | $15,971 |
| May 12, 2026 | Residential Roof Mounted Solar Electrical System | Solar PV System - 12.60 kW Flush Tied, Grid Tied On Detached Garage | Boulder County | $44,448 |
| Apr 14, 2026 | Electrical Permit | **VOID-SEE RFG2026-00327** Detach/Reset of existing solar panels for re-roof project. | Boulder | $2,250 |
| Mar 25, 2026 | Electrical Permit | ***REVISION 3/27/26-E-stop added to Electrical Line Diagram. Only adding Tesla Powerwall 3 Battery to existing solar system **PV installed under ELE2023-01274 | Boulder | $15,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed73
- Void6
- Not stated6
- Issued2
- Active1
- Closed1
- Finaled1
- Pending1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.