Contractor · Specialty (solar, fire, telecom)

SAN DIEGO SOLAR INSTALL INC

92 building permits since 2010 in San Diego County, CA; Oceanside city, CA and Vista city, CA.

Building permits
92
Reported job value
—
Active
2010–2026
Latest permit
Jun 1, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA77
  • Oceanside city, CA9
  • Vista city, CA4
  • San Diego city, CA2

Permits by year

By issue date (application date where there is none).

07.515
14
201120142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20103
20114
20124
20133
201414
20159
20163
20178
201811
20198
20208
20215
20222
20235
20241
20251
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar89
  • Electrical7
  • Battery storage3
  • Roofing2

Permit types

As the building departments classify them.

  • Existing43
  • BLD SOLAR PV RES5
  • Building Misc - Photovoltaic System (PV)3
  • Electrical2
  • BLD SOLAR PV RES - INCLUDES ENERGY STORAGE SYSTEM1
  • BLD SOLAR PV SYSTEM1
  • ELECTRIC PERMIT1
  • ENERGY STORAGE SYSTEM - SIMPLE1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 1, 2026ENERGY STORAGE SYSTEM - SIMPLEEES ADD ON TO EXISTING PV SYSTEM. 200A PV DEDICATED LOADOceanside City—
Jan 6, 2026Electrical—San Diego City—
Jan 6, 2026Electrical—San Diego City—
Oct 30, 2025Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM AND ENERGY STORAGE SYSTEMVista City—
Dec 11, 2024BLD SOLAR PV RES - INCLUDES ENERGY STORAGE SYSTEM5.6 KW ROOF MOUNTED PV EW/10KWH BATTERY, 14 PANELS 14 MICROOceanside City—
Dec 2, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jun 22, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Feb 20, 2023SFD SOLAR PV - SIMPLERoof PV, 13 mods, 13 microOceanside City—

Permit status

Where its permits stand, as the departments report them.

  • Completed59
  • Finaled13
  • Active9
  • Issued9
  • Expired1
  • Documents submitted1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.