Contractor · Plumbing

Right Way Plumbing LLC

92 building permits since 2012 in Minneapolis city, MN; Coon Rapids city, MN and Blaine city, MN, across 2 counties — $3,300 in reported job value over 2 permits that state one.

Building permits
92
Reported job value
$3.3K
Active
2012–2026
Latest permit
Jul 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN89
  • Coon Rapids city, MN2
  • Blaine city, MN1

Permits by year

By issue date (application date where there is none).

07.515
15
201620182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20121
20161
201710
201811
201915
202010
20217
202210
202312
20245
20258
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing92
  • Bathrooms48
  • Kitchens29
  • Remodels27
  • Gas12
  • Water heaters12
  • HVAC2
  • Additions2
  • Electrical2
  • Demolition1

Permit types

As the building departments classify them.

  • Plumbing91
  • BLDG - Residential1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 28, 2026PlumbingMain Level Kitchen Remodel / Replacement of Main Level Lavatory Faucet In Half BathroomMinneapolis City—
May 12, 2026BLDG - ResidentialPlumbing Permit - Fixture ReplacementBlaine City—
Dec 21, 2025PlumbingUpper Level Full Bathroom Remodel, Upper Level New All In One Washer / Dryer Ventless, New Main Level Half Bathroom, Main Level Kitchen RemodelMinneapolis City—
Nov 19, 2025PlumbingReplacement of kitchen sink, faucet and dishwasher in existing locations Replacement of existing laundry sink and faucet in existing location Modify / relocate Minneapolis City—
Aug 25, 2025PlumbingDemo existing rough ins in lower level basement Provide and install new rough ins to serve new fixtures listed above Provide and install new plumbing fixtures oMinneapolis City—
Jul 25, 2025PlumbingUpper Level Full Bathroom RemodelMinneapolis City—
Jul 22, 2025PlumbingUpper Level Full Bathroom Remodel Replacement of existing bathtub, toilet and Lavatory sink / faucet on existing rough insMinneapolis City—
Jun 13, 2025PlumbingMain Level Full Bathroom RemodelMinneapolis City—

Permit status

Where its permits stand, as the departments report them.

  • Closed86
  • Finaled3
  • Issued2
  • Expired1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.