Contractor · Electrical

Ali Hussein Bazzi

92 building permits since 2023 in Orleans Parish, LA.

Building permits
92
Reported job value
—
Active
2023–2026
Latest permit
Sep 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA92

Permits by year

By issue date (application date where there is none).

04080
75
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20238
202475
20256
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical67
  • HVAC28
  • Remodels25
  • New construction13
  • Plumbing2
  • Heat pumps2
  • Pools & hot tubs2
  • Kitchens1
  • Roofing1
  • Bathrooms1

Permit types

As the building departments classify them.

  • Renovation (Structural)2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 21, 2026—Furnish and install temp poleOrleans Parish—
Apr 13, 2026—Install HVAC System 1- 2.5 ton system with OXBOX equipment. The rough-in phase involves placing line sets, ducts, vents, and registers to facilitate air circulaOrleans Parish—
Apr 13, 2026—Install HVAC System 1- 2 ton system, and 1- 2.5 ton system with OXBOX equipment. The rough-in phase involves placing line sets, ducts, vents, and registers to fOrleans Parish—
Oct 20, 2025—Install new lighting fixtures, updated outlets/switches, Cabinet lighting, Ceiling fans. Light Remodel work. Exceeding the scope of the permit or failure to obtOrleans Parish—
Oct 20, 2025—Install new 125 amp panel. Install new lighting fixtures, updated outlets/switches, Cabinet lighting, Ceiling fans. Light Remodel work.Orleans Parish—
Apr 21, 2025—Rough in and Electrical trim out. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint aOrleans Parish—
Apr 10, 2025—Electrical Rough in and trim outOrleans Parish—
Apr 10, 2025—Rough in and Electrical trim out. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint aOrleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Finaled36
  • Not stated19
  • Issued14
  • Void9
  • C/o issued8
  • Expired4
  • Duplicate1
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.