Contractor · Electrical

Christopher Beye

851 building permits since 2018 in South Kingstown town, RI; Coventry town, RI and Warwick city, RI, across 7 counties — $4,982,188 in reported job value over 575 permits that state one.

Building permits
851
Reported job value
$5M
Active
2018–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • South Kingstown town, RI85
  • Coventry town, RI84
  • Warwick city, RI81
  • Cranston city, RI72
  • Narragansett town, RI65
  • North Kingstown town, RI59
  • Cumberland town, RI41
  • East Greenwich town, RI33
  • Glocester town, RI28
  • Scituate town, RI27

Permits by year

By issue date (application date where there is none).

0150300
286
20182023202420252026*
* 2026 is year to date.
View as table
YearPermits
20181
20231
2024279
2025284
2026 (YTD)286

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical849
  • Generators544
  • HVAC4
  • Kitchens3
  • Electric meters3
  • Remodels2
  • Bathrooms2
  • Plumbing2
  • Pools & hot tubs2
  • Heat pumps1

Permit types

As the building departments classify them.

  • Electrical Permit743
  • 2) Electrical Permit72
  • EG Electrical Permit33
  • Building Permit - One or Two Family Dwelling1
  • CO1
  • Plumbing Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026Electrical Permit—North Kingstown Town—
Oct 30, 2026Electrical Permit—Narragansett Town—
Oct 30, 2026Electrical Permit—North Kingstown Town—
Oct 29, 20262) Electrical PermitSypply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete padCranston City$8,500
Oct 29, 2026EG Electrical PermitSupply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete padEast Greenwich Town$8,500
Oct 29, 2026Electrical Permit—South Kingstown Town—
Oct 24, 2026Electrical PermitSupply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete padWarwick City$8,500
Oct 20, 2026EG Electrical PermitSupply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete padEast Greenwich Town$8,500

Permit status

Where its permits stand, as the departments report them.

  • Completed532
  • Active308
  • Stop work ordered10
  • C/o issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.