Contractor · Electrical
Christopher Beye
851 building permits since 2018 in South Kingstown town, RI; Coventry town, RI and Warwick city, RI, across 7 counties — $4,982,188 in reported job value over 575 permits that state one.
- Building permits
- 851
- Reported job value
- $5M
- Active
- 2018–2026
- Latest permit
- Oct 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- South Kingstown town, RI85
- Coventry town, RI84
- Warwick city, RI81
- Cranston city, RI72
- Narragansett town, RI65
- North Kingstown town, RI59
- Cumberland town, RI41
- East Greenwich town, RI33
- Glocester town, RI28
- Scituate town, RI27
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2023 | 1 |
| 2024 | 279 |
| 2025 | 284 |
| 2026 (YTD) | 286 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical849
- Generators544
- HVAC4
- Kitchens3
- Electric meters3
- Remodels2
- Bathrooms2
- Plumbing2
- Pools & hot tubs2
- Heat pumps1
Permit types
As the building departments classify them.
- Electrical Permit743
- 2) Electrical Permit72
- EG Electrical Permit33
- Building Permit - One or Two Family Dwelling1
- CO1
- Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 30, 2026 | Electrical Permit | — | North Kingstown Town | — |
| Oct 30, 2026 | Electrical Permit | — | Narragansett Town | — |
| Oct 30, 2026 | Electrical Permit | — | North Kingstown Town | — |
| Oct 29, 2026 | 2) Electrical Permit | Sypply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete pad | Cranston City | $8,500 |
| Oct 29, 2026 | EG Electrical Permit | Supply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete pad | East Greenwich Town | $8,500 |
| Oct 29, 2026 | Electrical Permit | — | South Kingstown Town | — |
| Oct 24, 2026 | Electrical Permit | Supply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete pad | Warwick City | $8,500 |
| Oct 20, 2026 | EG Electrical Permit | Supply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete pad | East Greenwich Town | $8,500 |
Permit status
Where its permits stand, as the departments report them.
- Completed532
- Active308
- Stop work ordered10
- C/o issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.