Contractor · Electrical

TITAN SOLAR POWER CA INC

853 building permits since 2020 in Los Angeles city, CA; San Diego County, CA and Sacramento County, CA, across 19 counties — $7,174,322 in reported job value over 315 permits that state one.

Building permits
853
Reported job value
$7.2M
Active
2020–2025
Latest permit
Mar 15, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA234
  • San Diego County, CA106
  • Sacramento County, CA99
  • Riverside city, CA82
  • Sacramento city, CA60
  • Norwalk city, CA52
  • Oceanside city, CA44
  • Merced city, CA23
  • Marin County, CA19
  • Madera city, CA15

Permits by year

By issue date (application date where there is none).

0200400
331
202020212022202320242025
View as table
YearPermits
202043
2021244
2022331
2023181
20249
20254

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar509
  • Electrical472
  • Plumbing76
  • Roofing70
  • Water heaters56
  • Battery storage25
  • Electric meters25
  • HVAC24
  • Additions4
  • EV chargers2

Permit types

As the building departments classify them.

  • Electrical248
  • Residential82
  • MISR59
  • Single Family58
  • SFD SOLAR PV - SIMPLE29
  • Solar Panel26
  • COXX23
  • PHOTOVOLTAIC SYSTEMS22

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 15, 2025MISRinstall roof mount solar PV system (6) 395W/2.37kw solar panels, 1 inverterSacramento County$4,336
Mar 15, 2025MISR(N) 125A/100A main panel upgradeSacramento County$2,200
Mar 15, 2025MISRInstallation of a 8 DC kW system with 20 modules and 1 inverterSacramento County$20,000
Mar 15, 2025MISRPV SOLAR ROOF MOUNT SYSTEM 11.60 KW WITH 29 MODULES., Panel Layout changeSacramento County$29,000
Aug 26, 2024MISRInstallation of a 225A MPUSacramento County$2,500
Aug 19, 2024CBNRInstallation of a 16.0 DC kW ground mount PV system with 40 modules and 40 micro inverters. DERATE MAIN BREAKER TO 150A, null, CH-02 removed the PV generation mSacramento County$38,000
Jun 11, 2024BLDG - Building (R)Online roof mount solar 16 panels 6.72 kW DC roof-mount PV system with 9.7 kWh ESS.Temecula City—
May 14, 2024—Photovoltaic System Remove And Reinstall Solar Ref: Bld2020-03880Anaheim City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated280
  • Issued210
  • Completed132
  • Finaled97
  • Active56
  • Expired46
  • Closed9
  • Additional information required9

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • TITAN SOLAR POWER CA
  • TITAN SOLAR POWER CA INC TITAN SOLAR

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.