Contractor · General building
Ed McDonald
96 building permits since 2013 in Arlington town, MA; Lexington town, MA and Boston city, MA, across 4 counties — $5,118,741 in reported job value over 86 permits that state one.
- Building permits
- 96
- Reported job value
- $5.1M
- Active
- 2013–2026
- Latest permit
- Oct 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Arlington town, MA29
- Lexington town, MA14
- Boston city, MA9
- Somerville city, MA8
- Winchester town, MA8
- Cambridge city, MA5
- Concord town, MA4
- Reading town, MA4
- Needham town, MA4
- Beverly city, MA3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 1 |
| 2015 | 1 |
| 2016 | 1 |
| 2018 | 2 |
| 2019 | 1 |
| 2021 | 4 |
| 2022 | 6 |
| 2023 | 18 |
| 2024 | 20 |
| 2025 | 20 |
| 2026 (YTD) | 22 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical40
- Remodels25
- Bathrooms19
- Additions10
- Kitchens8
- Windows & doors6
- Roofing4
- Demolition4
- Fire sprinklers1
Permit types
As the building departments classify them.
- Electrical Permit Application29
- Building Permit Application9
- Interior Alterations8
- Building Permit6
- Building: Alteration and Addition5
- INTREN4
- Building Permit - Residential (Single, 2-Family or Townhouses) Projects3
- Electrical3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 13, 2026 | Electrical Permit Application | Yes | Arlington Town | $30,000 |
| Oct 6, 2026 | Building Permit | Add 2nd story addition (18'-2" X 35'-2") with 1 bedroom, 1 bathroom, and walk-in closet to the far right side of the house per plan, and a 1 story addition (7' | Reading Town | $327,450 |
| Aug 25, 2026 | Building Permit | 2nd floor Primary bathroom remodel//add walk in shower, new window - and 1/2 bath - as per plans | Reading Town | $19,530 |
| Aug 5, 2026 | — | Renovation of kitchen and second floor bathroom per plans w/ 3rd floor dormer addition adding master bedroom, guest bedroom, laundry, office nook, bathroom | Somerville City | $555,425 |
| Jul 7, 2026 | ELECTRICAL | ELECTRICAL | Boston City | $15,000 |
| Jun 30, 2026 | Building: Alteration and Addition | — | Cambridge City | — |
| Jun 25, 2026 | Interior Alterations | Replace two basement Lally colums per engineering plan | Lexington Town | $3,000 |
| Jun 13, 2026 | Replacement Windows and Doors | Replace all wood windows including basement | Lexington Town | $30,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed51
- Active28
- Closed7
- Issued4
- Finaled2
- Stop work ordered2
- Cancelled1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.