Contractor · Specialty (solar, fire, telecom)

VISION INSTALLATION

97 building permits since 2014 in Camarillo city, CA; Oceanside city, CA and Los Angeles city, CA, across 6 counties — $136,600 in reported job value over 7 permits that state one.

Building permits
97
Reported job value
$136.6K
Active
2014–2017
Latest permit
Aug 15, 2017

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Camarillo city, CA34
  • Oceanside city, CA29
  • Los Angeles city, CA14
  • Riverside city, CA6
  • Vista city, CA4
  • Norwalk city, CA3
  • Chico city, CA2
  • West Hollywood city, CA2
  • Kings County, CA1
  • San Diego County, CA1

Permits by year

By issue date (application date where there is none).

04080
73
2014201520162017
View as table
YearPermits
20142
20158
201673
201714

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar82
  • Electrical29
  • Roofing6
  • HVAC1

Permit types

As the building departments classify them.

  • BLD SOLAR PV RES19
  • RESIDENTIAL ROOFTOP SOLAR SYSTEM18
  • Electrical15
  • BLD SOLAR PV RES - PV WITH UPGRADE10
  • BRES6
  • RESROOFTOP SOLAR STD PLAN ONLINE6
  • Building Misc - Photovoltaic System (PV)4
  • RES ROOFTOP SOLAR/PANEL UPGRADE 15 KW MAX3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 15, 2017ElectricalPC FOR PV SYSTEM ROOF MOUNTED. USING MICROINVERTERS. ENPHASE M250. USILos Angeles City—
Aug 1, 2017Electrical—Los Angeles City—
May 19, 2017BRESINSTALL PV SOLAR SYSTEM WITH (30) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF 8.40KW 7/14/17 - REVISION: INSTALL PV SOLAR SYSTEM WITH (15) PHOTOVOLTAIC PANELS ON RERiverside City$24,500
May 8, 2017RESROOFTOP SOLAR STD PLAN—Camarillo City—
Apr 28, 2017RESROOFTOP SOLAR STD PLAN—Camarillo City—
Apr 20, 2017RESROOFTOP SOLAR STD PLAN—Camarillo City—
Apr 19, 2017A/C CHANGEOUT, ONLINE - SAME LOCATION—Camarillo City—
Apr 11, 2017RESIDENTIAL ROOFTOP SOLAR SYSTEM—Camarillo City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled63
  • Not stated15
  • Expired10
  • Completed4
  • Issued3
  • Approved1
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.