Contractor · Specialty (solar, fire, telecom)
Stephen Kelly - SunRun
883 building permits since 2020 in Plymouth town, MA; Barnstable Town city, MA and Hanover town, MA, across 4 counties — $25,833,125 in reported job value over 735 permits that state one.
- Building permits
- 883
- Reported job value
- $25.8M
- Active
- 2020–2026
- Latest permit
- Aug 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Plymouth town, MA183
- Barnstable Town city, MA118
- Hanover town, MA79
- Dartmouth town, MA62
- Yarmouth town, MA61
- Dedham town, MA56
- Wareham town, MA53
- Quincy city, MA44
- Norton town, MA38
- Sharon town, MA31
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 602 |
| 2026 (YTD) | 278 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar789
- Battery storage619
- HVAC18
- Windows & doors14
- Fire sprinklers14
- Electrical11
- Electric meters8
- Roofing2
- Remodels1
- EV chargers1
Permit types
As the building departments classify them.
- Building Permit193
- Solar Permit162
- Building Permit - Residential151
- Solar Panels and Energy Storage Systems94
- Building Permit Application64
- Building Permit - Express61
- Misc./General Fire Permit30
- Photovoltaic Solar Permit30
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 14, 2026 | Building Permit Application | Installation of an interconnected rooftop PV system 8 Panels 3.6 KW DC. * (No Battery Storage) (No Structural) | Quincy City | $23,664 |
| Jul 17, 2026 | Solar Permit | Installation of an interconnected rooftop PV system 16 panels 6.48 KW DC and one FRANKLIN 15KWH, 10KW INVERTER OUTPUT, LITHIUM IRON PHOSPHATE BATTERY installed | Plymouth Town | $19,180 |
| Jul 6, 2026 | Solar Panels and Energy Storage Systems | — | Plymouth Town | — |
| Jun 25, 2026 | Building Permit Application | one Tesla Powerwall 3, 13.5 KHW Lithium Ion battery installed on exterior of the home | Quincy City | $10,000 |
| Jun 16, 2026 | Solar Panels and Energy Storage Systems | — | Plymouth Town | — |
| Jun 13, 2026 | Commercial Standard Permit (Cutting/Welding, sprinkler, fire alarm plan reviews) | Installation of an interconnected rooftop PV system 37 panels 15.17 KW DC and one FRANKLIN 15KWH, 10KW INVERTER OUTPUT, LITHIUM IRON PHOSPHATE BATTERY installed | Norton Town | — |
| May 22, 2026 | Building Permit - Solar | Installation of an interconnected rooftop PV system 25 panels 10.125 KW DC and one FRANKLIN 15KWH, 10KW INVERTER OUTPUT, LITHIUM IRON PHOSPHATE BATTERY installe | Norton Town | $44,260 |
| May 11, 2026 | Commercial Standard Permit (Cutting/Welding, sprinkler, fire alarm plan reviews) | Installation of an interconnected rooftop PV system 40 panels 16.4 KW DC and one FRANKLIN 15KWH, 10KW INVERTER OUTPUT, LITHIUM IRON PHOSPHATE BATTERY installed | Norton Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed541
- Active306
- Stop work ordered35
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.