Contractor · Specialty (solar, fire, telecom)

Stephen Kelly - SunRun

883 building permits since 2020 in Plymouth town, MA; Barnstable Town city, MA and Hanover town, MA, across 4 counties — $25,833,125 in reported job value over 735 permits that state one.

Building permits
883
Reported job value
$25.8M
Active
2020–2026
Latest permit
Aug 14, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Plymouth town, MA183
  • Barnstable Town city, MA118
  • Hanover town, MA79
  • Dartmouth town, MA62
  • Yarmouth town, MA61
  • Dedham town, MA56
  • Wareham town, MA53
  • Quincy city, MA44
  • Norton town, MA38
  • Sharon town, MA31

Permits by year

By issue date (application date where there is none).

0400800
602
20202023202420252026*
* 2026 is year to date.
View as table
YearPermits
20201
20231
20241
2025602
2026 (YTD)278

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar789
  • Battery storage619
  • HVAC18
  • Windows & doors14
  • Fire sprinklers14
  • Electrical11
  • Electric meters8
  • Roofing2
  • Remodels1
  • EV chargers1

Permit types

As the building departments classify them.

  • Building Permit193
  • Solar Permit162
  • Building Permit - Residential151
  • Solar Panels and Energy Storage Systems94
  • Building Permit Application64
  • Building Permit - Express61
  • Misc./General Fire Permit30
  • Photovoltaic Solar Permit30

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 14, 2026Building Permit ApplicationInstallation of an interconnected rooftop PV system 8 Panels 3.6 KW DC. * (No Battery Storage) (No Structural)Quincy City$23,664
Jul 17, 2026Solar PermitInstallation of an interconnected rooftop PV system 16 panels 6.48 KW DC and one FRANKLIN 15KWH, 10KW INVERTER OUTPUT, LITHIUM IRON PHOSPHATE BATTERY installed Plymouth Town$19,180
Jul 6, 2026Solar Panels and Energy Storage Systems—Plymouth Town—
Jun 25, 2026Building Permit Applicationone Tesla Powerwall 3, 13.5 KHW Lithium Ion battery installed on exterior of the homeQuincy City$10,000
Jun 16, 2026Solar Panels and Energy Storage Systems—Plymouth Town—
Jun 13, 2026Commercial Standard Permit (Cutting/Welding, sprinkler, fire alarm plan reviews)Installation of an interconnected rooftop PV system 37 panels 15.17 KW DC and one FRANKLIN 15KWH, 10KW INVERTER OUTPUT, LITHIUM IRON PHOSPHATE BATTERY installedNorton Town—
May 22, 2026Building Permit - SolarInstallation of an interconnected rooftop PV system 25 panels 10.125 KW DC and one FRANKLIN 15KWH, 10KW INVERTER OUTPUT, LITHIUM IRON PHOSPHATE BATTERY installeNorton Town$44,260
May 11, 2026Commercial Standard Permit (Cutting/Welding, sprinkler, fire alarm plan reviews)Installation of an interconnected rooftop PV system 40 panels 16.4 KW DC and one FRANKLIN 15KWH, 10KW INVERTER OUTPUT, LITHIUM IRON PHOSPHATE BATTERY installed Norton Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed541
  • Active306
  • Stop work ordered35
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.