Contractor · Electrical

Patrick McDonough Sheridan

97 building permits since 2019 in Orleans Parish, LA.

Building permits
97
Reported job value
—
Active
2019–2026
Latest permit
Sep 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA97

Permits by year

By issue date (application date where there is none).

012.525
21
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20192
202012
202121
202212
202315
202414
202512
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical77
  • Electric meters13
  • Remodels12
  • Bathrooms9
  • New construction8
  • Kitchens6
  • HVAC3
  • Generators3
  • Pools & hot tubs2
  • Battery storage1

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)2
  • Renovation (Structural)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 23, 2026—Sheridan Electric to conduct a vacancy inspection at the property due to the fact that the power has been out for more than 6 months. We will be adding two grouOrleans Parish—
Sep 23, 2026—Sheridan Electric to conduct a vacancy inspection at the property due to the fact that the power has been out for more than 6 months. We will be adding two grouOrleans Parish—
Sep 22, 2026—To reinstall the mast that has fallen over at the house. We will be adding a new grounding system and surge protector.Orleans Parish—
Sep 22, 2026—Background and Code Basis: The existing electrical meter is located in the rear yard of the property, behind a closed fence. Entergy requires unobstructed 24/7 Orleans Parish—
May 17, 2026—Based on vacancy inspection, a new to add a new ground rod, a bonding bridge and eight feet of number 4 ground due to the fact there was only one ground rod. PoOrleans Parish—
Feb 25, 2026—Sheridan Electric to install new wires, outlets, switches, light fixtures, A/C ext. Everything a new house needs. We will be adding a new service, new panel, neOrleans Parish—
Feb 25, 2026—Sheridan Electric to install new wires, outlets, switches, light fixtures, A/C ext. Everything a new house needs. We will be adding a new service, new panel, neOrleans Parish—
Feb 11, 2026—Sheridan Electric to move existing can lights, vanity lights, and gfi outlets and a heater vent light in to bathrooms. Sheridan Electric to provide all materialOrleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Not stated33
  • Issued32
  • Finaled18
  • C/o issued11
  • Expired2
  • Closed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.